Considering the effects of the construction process, calculate the displacements verticals for the confined masonry wall shown. Suppose: Columns: 0.15 x 0.15 m Ec = 2,000,000 ton/m2 Masonry: 0.15 x 2.00 m cloths Ea= 500,000 ton/m2 Pi = permanent charges per level (ton) RESULTS 20m 20 x 81 = 0.0003161 82 = 0.0004023 83 = 0.0002586 2.5 P3 = 15 ton P2 = 20 ton 2.5 m P1 = 20 ton 2.5
Q: Question 3.3 When the air with a pressure of 0.1 MPa and a specific volume of 0.8 m³/kg was provided…
A: In conclusion, the work done by the compressor, considering the increase in internal energy, the…
Q: Answer fast
A:
Q: solve the following problem with the correct answer please, please make sure to show all work so I…
A: Critical Stress = Pcr/ A Given:d0 =6"di = 5"L= 28ft= 336"E= 29x103 ksi Pcr= π2EI/ L2 =…
Q: The bucket is being supported be the three cables DA, DB andDC. Note that cables may only carry…
A:
Q: solve the following problem with the correct answer please, please make sure to show all work so I…
A: Given:Magnitude of resultant (R) along vertical direction (y-axis) = 750 Nmagnitude of vector P =…
Q: Plot the shear and moment diagrams for the beam loaded with the distributed and point loads in…
A:
Q: CHAPTER 3, Part 1 - Problem 2: A new one-way on-ramp will be constructed from US-460 to Southgate Dr…
A: Step 1:
Q: 10 A surface water treatment plant is being designed to process 50 mgd. The preliminary size of the…
A:
Q: Consider the floor framing plan included on the next page. Using an unfactored floor dead loadof 75…
A: Step 1: To determine the minimum required design load and the design moment for the typical 28K9…
Q: The vertical reaction at support B is 6.53kN. a) considering the reference at the left-hand side,…
A: Part a)Part b)
Q: A track dozer costs $240,000 to purchase.You plan to use it for 5 years, and each year you expect to…
A: Step 1 Calculate the Present Value of the Salvage Value:This is the amount the dozer will be worth…
Q: Please solve the following problem ste by step so I can understand
A: Step 1:Step 2:Step 3: Step 4:
Q: A truss is loaded as shown in the figure. Determine the following: a) Vertical component of the…
A: Step 1: Fill the Dimension of the Truss:(Sum of Interior Angles of Triangle is always 180o.…
Q: Draw shear and moment diagrams for the following beam. What is the maximum shear forcepresent? What…
A: Solution: Given: L= 12 ft and P= 5 lbs L/3= 4 ft, 4P= 20 lbs and 2P= 10 lbs
Q: a. What activities make up the critical path? b. When is the proposed finish date? c. What are two…
A: Initial Setup:Start Date: Monday, September 30, 2024Work Week: Standard 5-day work week (no weekends…
Q: 4. Calculate the cracking moment (resisting moment) for the unreinforced concrete beam shown. Assume…
A:
Q: Determine the shear and moment throughout the beam as functions of x.
A: Analyzing the Beam and Determining Shear and Moment FunctionsUnderstanding the Problem:We have a…
Q: 1 100.950 8 100.900 ✓ 100.800 c 3 100.830 100.730 100.750 ☑100.550 0 X100.740 X100.720 100.735…
A: Since no question was attached I am answering with respect to a similar question I found…
Q: Please help with this sample problem presented in our lecture. Explain the relevant concepts on how…
A:
Q: Please help me delineate the watershed given in the picture. The second picture it was me trying to…
A: Approach to solving the question: Detailed explanation:A watershed delineation is an important…
Q: Determine the moment of inertia of the area about the y axis I, and the radius of gyration ky. 160…
A: 1. Divide the Area into Simple Shapes:We will divide the given composite area into three…
Q: Consider the floor framing plan included on the next page. Using an unfactored floor dead loadof 75…
A: Step 1:Given Data;Dead Load, WD = 75 psfLive Load, WL = 65 psf The minimum required design load and…
Q: Please draw diagram
A: . This method involves the following steps:1. **Determine the degree of indeterminacy**: - The…
Q: You are given the structural steel side view shown below. What is the structural takeoff quantity…
A: Given the cable tray: Step 1. Let's find the weight of the steel members per linear foot.For…
Q: Data from a 6-ft by 6-ft inductive loop detector collected during a time period of 24 sec indicate…
A: First, we need to convert the speed from miles per hour to feet per second for consistency with…
Q: Design a steel column using ISHB Section for 1150 kn force. Height of column 3.25m both ends hinged.…
A: Disclaimer: This response provides a basic outline and assumptions for designing a steel column.…
Q: What type of foundation type you think should be used in the given soil conditions and load…
A: Foundation Type Recommendations 20 tons, 10 feet soft peat over 80 feet dense sand:Foundation Type:…
Q: Trying to see if I did this right or how to adjust formulas. This is not a graded assignment I have…
A: Let's go through the step-by-step guide to set this up in Excel. Step 1: Set Up the Structure in…
Q: For the Closed Polygon traverse given below, the given lengths in feet, Compute and tabulate: a)…
A: Tabulated data:d.) Given XA = 10 000 and YA = 5000, the next points are determined by adding the…
Q: please solve the following problem on pencil and paper so I can understand. Please show all work.
A:
Q: Circle final answers.
A: 1st image answers:2nd image answers:
Q: SOLVE THE FOLLOWING PROBLEM WITH STEP BY STEP SOLUTIONS SO I CAN UNDERSTAND THE PROBLEM WELL. PLEASE…
A: Ixx = (1/12) * b * h^3 Ixx = Ixx_centroid + A * d^2The total moment of inertia of…
Q: on paper solution and work
A:
Q: How can architects gain practical experience in electricial systems?
A: Architects can gain practical experience in electrical systems through several avenues:Internships…
Q: Please calculate the centroid x and y bar, and Ixx for the following shapes. Show all work with neat…
A: ## Understanding the Problem**Problem:** Calculate the centroid (x̄, ȳ) and moment of inertia (Ixx)…
Q: (7 Problem 1. The concrete (y = 150 lb/ft³) dam shown below retains water (y = 62.4 lb/ft³) at a…
A: Given:Concrete density, γc=150lb/ft3Water density,γ=62.4lb/ft3Dam height = 25 ftWater depth = 20…
Q: Problem 4. Determine the resultant of the line load acting on the beam ABC and its location from B.
A: Step 1. Equivalent Load Line load varies linearly from 1200 lb/ft at point A to 1700 lb/ft at point…
Q: The operation used to separate a liquid-liquid mixture is: A) Filtration B) Extraction C)…
A:
Q: Answer fast and explain the answer.
A: To find the drain spacing, we can use the Hooghoudt equation for drainage design. The Hooghoudt…
Q: 10. The particle passes point O at the speed of 8 m/s. Between O and B, the speed increases at the…
A:
Q: please solve the following problem on pencil and paper so I can understand. Please show all work.
A: Step 1:Step 2:
Q: SOLVE STEP BY STEP WITHOUT ARTIFICIAL INTELLIGENCE, SOLVE BY HAND STEP BY STEP Using the flexibility…
A: Step 1:
Q: Using the CREMONA method, determine the forces and types of stress in the bars and analyze them.
A: To analyze the truss using the **Cremona method**, follow these steps:### Step 1: Identify all the…
Q: Problem 2 Problem 13.169 The river flows north at 3 m/s. (Assume that the current is uniform.) If…
A: Given speed of river (vr) = 3 m/s towards northResultant speed from C to D (R) = 10 m/s Now taking…
Q: ? 500 5000 500 ? mm TML=180 Wm Тома=80Nm Nd=15004N INd=1500 GN (1.46+1.6Q Lood Con C35/45 B420c **…
A: 1. Structural Inputs - Loads: - Normal force (Nd) = 1500 kN react at two columns. - Moment (Md) =…
Q: A simple house project can be structured as follows (9 work packages total): • Design: Ground plans…
A: Here's a proposed Work Breakdown Structure (WBS) with some additional sub-tasks:1. House Project1.1…
Q: please answer this, will give upvot thanks
A:
Q: Solution: 8,412.00 m² Site Details: Section Width (S)-12 m 13 m 49 m 51 m 58 m 60 m 60 m 57 m…
A: Step 1: Analyzing the Excavation Site Understanding the Data:The excavation site is divided into…
Q: Answer fast and give right answer
A: Let's find the first and second fundamental coefficients for the given surface parameterized by…
Q: Which of the following categories of projects is often publicly funded and also termed…
A: The question is asking us to identify which category of projects is often funded by public money and…
Step by step
Solved in 2 steps with 2 images
- (2) + 4 6 " 28 Uncracked M = 30 ftop = ? ft-k Mer=? foot = ?The slab shown is subjected to four parallel forces. Determinethe magnitude and direction of a resultant force equivalent to thegiven force system, and locate its point of application on the slab.What is A = Asector - Atriangle? Where did they get that?
- i need the answer quicklyممكن حل هذه؟Determine the losses in the post-tensioned concrete beam as shown below. 560 mm Given: POST-TENSIONED BEAM with A PARABOLIC TENDON PROFILE Span Length = 20 m fi = 1200 N/mm² A, = 2850 mm² Ac 4.23x105 mm² 1=9.36x10¹0 mm e-560 mm (@midspan, from N.A.) fc= 40 N/mm² Es = 210,000 N/mm² μ = 0.19 K = 0.0005 (per meter) Anchorage slip = 5 mm (jacked at left-end only). (make sure to draw the force variation diagram for anchorage slip) V/S= 6 RH = 70 Dead Load 9.97 kN/m fpy = 1714 N/mm² Bridge Width III
- 30" 12" D 26" fc= 3.5 ksiran fy = = 40 ksi n = 9 As = 8# 6 Find fr (modulous of rupture) = ? M, bending moment = ? k=? j = ? y = ? I = ?Subject :Q3: For the small building which is covered by a slab 20 cm thick as Shown. Concrete Blocks are 40x40x20 cm. The wall height is 4 m from footing to bottom of the slab. Reinforcements are as shown. Measurements accuracy is required up to two decimal points only. 1. Estimate the amount of cement required for the walls only if the mortar used for construction is 1:4 [cement: sand]. 2. Estimate the amount of steel required for the footing and the slab. Steel 12 mm @ 20 cm c/c in short direction and 12 mm@ 25 cm c/c in long direction 40 cm Ties 10mm at 25 cm c/c e bars 916mm + 40 cm -100 cm- 200 cm +50+40+ -300 cm- 120 cm +40-150 cm- fost
- A 50-m steel has an error of 0.02 m at 20°C with a pull of 50 N. A rectangular lot is to be staked out using this tape. The sides are 24.63 m and 10.65 m. The average temperature of the tape during staking out is 20°C with a pull of 50 N. The laid out area of the lot in square meters is: NOTE: Units are not required. Round-off to two decimal places.The following diagram shows a partial floor framing plan of an elevated walkway building connecting an airport terminal building to the adjacent garage. The concrete floor is not post- tensioned. Material properties are: - Concrete weight: wt = 150 pcf - Concrete compressive strength: f'c = 4000 psi - Steel tensile strength: fy = 60 ksi - Stirrup consists of #4 bar - Framing members are not exposed to weather or in contact with soil. Per the ACI, what is the minimum slab depth? Consider both the interior slab and the cantilevered slab at the edge of the building. 30-0¹ B4 B4 B4 83 Column 52 SI 30-0 -Sab Mark Dean- B4 B4 B4 83 B 30-0¹ BI B2 B2 BI -Girder 12 A 1 3-4 Ei 13:4 05 40-0 to 2Example: Calculate the masonry works above water proofing level for the plan shown in Figure: thickness of walls is 0.24 m, mortar mix ratio (1:3). Clear high = 2.5m. Using: 1. Stone if the volume of voids is 25% from volume of building. 2. Bricks units. W1 WI DI D2 WI W2 113 9.0 -5.0- Width in 1.0 1.2 20 15 1.0 DI DI -2.05 20 W3 Height m 2.2 2.2 1.6 1.6 1.6 5.0 6.0 D2 W2