Consider a stormwater retention pond that has no outflow. The pond is initially filled with pristine rainwater to a volume of 35 m³, and it loses water at a rate of 55 L/day due to evaporation. Over a period of two weeks, the pond receives an inflow of 650 L/day of drainage water from a nearby construction project. The construction drainage is contaminated with road salt to a concentration of 250 mg/L salt. Assume that salt is a conservative substance and does not precipitate out of solution. a. Construct a mass balance on flow. Define an initial condition for flow in the pond. Use the initial condition to solve the volume mass balance. Express volume in the pond as a function of time (V(t)). b. Construct a mass balance on salt. Substitute the expression for volume as a function of time into the salt mass balance. Express the change in salt concentration with time as a function of time (dC/dt). c. What is the rate of change (mg/(L-day)) of the salt concentration in the pond at 14 days after the start of the construction drainage inflow?
Consider a stormwater retention pond that has no outflow. The pond is initially filled with pristine rainwater to a volume of 35 m³, and it loses water at a rate of 55 L/day due to evaporation. Over a period of two weeks, the pond receives an inflow of 650 L/day of drainage water from a nearby construction project. The construction drainage is contaminated with road salt to a concentration of 250 mg/L salt. Assume that salt is a conservative substance and does not precipitate out of solution. a. Construct a mass balance on flow. Define an initial condition for flow in the pond. Use the initial condition to solve the volume mass balance. Express volume in the pond as a function of time (V(t)). b. Construct a mass balance on salt. Substitute the expression for volume as a function of time into the salt mass balance. Express the change in salt concentration with time as a function of time (dC/dt). c. What is the rate of change (mg/(L-day)) of the salt concentration in the pond at 14 days after the start of the construction drainage inflow?
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
WILL RATE IF CORRECT!
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 8 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning