Complete the roadway survey data below for this proposed roadway project by identifying elevation of the curve at every 20m station points within the curves considering the design specification of the proposed roadway, the thickness of the concrete road itself (use DPWH standard concrete roadway thickness for one lane local access roadway) while the soil excavation needed is 0.7m depth before applying the gravel in fill all throughout the 2km roadway, the highest and the lowest points within each curves, offset distance between the curve and the tangent lines at every 20m station points. (Basing all at the center-line of the curve) Tabulate the results respectively

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Complete the roadway survey data below for this proposed roadway project by identifying elevation of the curve at every 20m station points within the curves considering the design specification of the proposed roadway, the thickness of the concrete road itself (use DPWH standard concrete roadway thickness for one lane local access roadway) while the soil excavation needed is 0.7m depth before applying the gravel in fill all throughout the 2km roadway, the highest and the lowest points within each curves, offset distance between the curve and the tangent lines at every 20m station points.
(Basing all at the center-line of the curve)

Tabulate the results respectively

GRADE
ELEVATION
CURVES
LINE
STATIONS
SLOPE
Sta. A 2+165
120m
1
АВ
-5%
Sta. B 2+340
BC
+7%
Sta. C 2+515
Sta. C 2+515
CD
+7%
2
Sta. D 2+740
DE
-6%
Sta. E 2+990
Sta. E 2+990
EF
-6%
Sta. F 3+115
3
Sta. PCC
F-PCC
0%
3+265
Sta. PCC
PCC-G
0%
3+265
4
Sta. G 3+455
GH
+8%
Sta. H 3+645
Sta. H 3+645
HI
+8%
Sta. 1 3+775
5
Sta. PRC
I-PRC
-4%
3+905
Sta. PCC
PRC-J
-4%
3+905
6
Sta. J 4+035
JK
+5%
Sta. K 4+165
Transcribed Image Text:GRADE ELEVATION CURVES LINE STATIONS SLOPE Sta. A 2+165 120m 1 АВ -5% Sta. B 2+340 BC +7% Sta. C 2+515 Sta. C 2+515 CD +7% 2 Sta. D 2+740 DE -6% Sta. E 2+990 Sta. E 2+990 EF -6% Sta. F 3+115 3 Sta. PCC F-PCC 0% 3+265 Sta. PCC PCC-G 0% 3+265 4 Sta. G 3+455 GH +8% Sta. H 3+645 Sta. H 3+645 HI +8% Sta. 1 3+775 5 Sta. PRC I-PRC -4% 3+905 Sta. PCC PRC-J -4% 3+905 6 Sta. J 4+035 JK +5% Sta. K 4+165
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Highway surveys and location
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning