Complete the roadway survey data below for this proposed roadway project by identifying elevation of the curve at every 20m station points within the curves considering the design specification of the proposed roadway, the thickness of the concrete road itself (use DPWH standard concrete roadway thickness for one lane local access roadway) while the soil excavation needed is 0.7m depth before applying the gravel in fill all throughout the 2km roadway, the highest and the lowest points within each curves, offset distance between the curve and the tangent lines at every 20m station points. (Basing all at the center-line of the curve) Tabulate the results respectively
Complete the roadway
(Basing all at the center-line of the curve)
Tabulate the results respectively
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images