*choose the appropriate word to fill in the blanks in each of the following sentences: A/ In rotary drilling the drilling processes accompanied by Pumping water with [1-cement, 2-Sands 3- clay] B/ In wash boring the excoration process begins in this Way be hammering a casing Pife into the Soil at adepin ranging between [1-(2m and 3.5m), 2-(3m aud 6m) 93-(smand (120) of/ The use of Percussion drilling is limited to places with CI-hard soil and rock, 2- Soft clay, 3-Silt and clay) D/ Split-spoon methode is one of the most common methods for extracting -- samples (1-undisturbed, 2-disturbed 3-compacted) E/ Shelby tube me thod is also know as the thin-walled and its tube, as the Length of the tuble is abut. internal and external diameters are 50.80mm and 76.20mm, respedirely [1-(50 cm), 2-(qocm), 3-(120cm) }

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
*choose the appropriate word to fill in the blanks in
each of the following sentences:
A/In rotary drilling the drilling processes accompanied by
Pumping water with [1-cement, 2- Sandy 3- clay]
B/ In wash boring the excoration process begins in this
Way be hammering a casing Pife into the Soil at adepin
ranging between [1-(2m and 3.5m), 2-(3m and 6m) 93-(smand (12)
of/ The
use of Percussion drilling is limited to places with
CI-hard soil and rock, 2- Soft clay, 3-Silt and clay)
D/ Split-spoon methode is one of the most common methods
for extracting -- samples (1-undisturbed, 2-disturbed
3-compacted)
E/ Shelby tube method is also know as the thin-walled
and its
tube, as the Length of the tuble is abut.
internal and external diameters are 50.80mm and 76.20mm,
respedirely [1- (60 cm), 2-(qocm), 3-(120cm) }
Transcribed Image Text:*choose the appropriate word to fill in the blanks in each of the following sentences: A/In rotary drilling the drilling processes accompanied by Pumping water with [1-cement, 2- Sandy 3- clay] B/ In wash boring the excoration process begins in this Way be hammering a casing Pife into the Soil at adepin ranging between [1-(2m and 3.5m), 2-(3m and 6m) 93-(smand (12) of/ The use of Percussion drilling is limited to places with CI-hard soil and rock, 2- Soft clay, 3-Silt and clay) D/ Split-spoon methode is one of the most common methods for extracting -- samples (1-undisturbed, 2-disturbed 3-compacted) E/ Shelby tube method is also know as the thin-walled and its tube, as the Length of the tuble is abut. internal and external diameters are 50.80mm and 76.20mm, respedirely [1- (60 cm), 2-(qocm), 3-(120cm) }
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Measuring sitework, excavation and piling
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning