CCA Ltd. is a composite boat manufacturing company based at Gold Coast, Queensland. The manufacturing of a type of family fishing boat has been divided into 5 work elements. To analyse the efficiency, the production manager performed a work measurement and the recorded element times for the first five cycles are shown in the following table with a performance rating (RF) for each element. Element Cycle 1 Cycle 2 Cycle 3 Cycle 4 Cycle 5 Performance rating % (RF) 1 1.34 1.68 1.45 1.76 1.52 115 2 2.50 2.75 2.67 2.55 2.45 105 3.11 3.22 3.15 4.21 3.38 110 4 4.11 4.23 4.56 4.22 6.42 90 5 5.51 5.43 5.22 5.34 5.55 120 Note: all element times are recorded in hours. (a) Based on the times observed through five cycles, determine their normal times for the cycles and the normal time for the whole job. (b) Calculate the standard time, if there is a fatigue allowance of 8 % and a contingency allowance of 7.5%. (c) If a worker is employed on a 5 day, 37.5 hour/week with 1.5 hours per day for breaks, how many workers are needed for a daily production of 25? 3.
CCA Ltd. is a composite boat manufacturing company based at Gold Coast, Queensland. The manufacturing of a type of family fishing boat has been divided into 5 work elements. To analyse the efficiency, the production manager performed a work measurement and the recorded element times for the first five cycles are shown in the following table with a performance rating (RF) for each element. Element Cycle 1 Cycle 2 Cycle 3 Cycle 4 Cycle 5 Performance rating % (RF) 1 1.34 1.68 1.45 1.76 1.52 115 2 2.50 2.75 2.67 2.55 2.45 105 3.11 3.22 3.15 4.21 3.38 110 4 4.11 4.23 4.56 4.22 6.42 90 5 5.51 5.43 5.22 5.34 5.55 120 Note: all element times are recorded in hours. (a) Based on the times observed through five cycles, determine their normal times for the cycles and the normal time for the whole job. (b) Calculate the standard time, if there is a fatigue allowance of 8 % and a contingency allowance of 7.5%. (c) If a worker is employed on a 5 day, 37.5 hour/week with 1.5 hours per day for breaks, how many workers are needed for a daily production of 25? 3.
MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
Related questions
Question
![CCA Ltd. is a composite boat manufacturing company based at Gold Coast, Queensland. The
manufacturing of a type of family fishing boat has been divided into 5 work elements.
To analyse the efficiency, the production manager performed a work measurement and the
recorded element times for the first five cycles are shown in the following table with a
performance rating (RF) for each element.
Element Cycle 1 Cycle 2 Cycle 3 Cycle 4 Cycle 5 Performance rating % (RF)
1.34
1.68
1.45
1.76
1.52
115
2
2.50
2.75
2.67
2.55
2.45
105
3.11
3.22
3.15
4.21
3.38
110
4
4.11
4.23
4.56
4.22
6.42
90
5
5.51
5.43
5.22
5.34
5.55
120
Note: all element times are recorded in hours.
(a) Based on the times observed through five cycles, determine their normal times for the
cycles and the normal time for the whole job.
(b) Calculate the standard time, if there is a fatigue allowance of 8 % and a contingency
allowance of 7.5%.
(c) If a worker is employed on a 5 day, 37.5 hour/week with 1.5 hours per day for breaks,
how many workers are needed for a daily production of 25?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F236d8876-c0f0-4478-ae7e-5bc335bc1462%2F4d732b18-3dcd-41b4-b644-3b3e1e8abe8e%2Fviux69_processed.png&w=3840&q=75)
Transcribed Image Text:CCA Ltd. is a composite boat manufacturing company based at Gold Coast, Queensland. The
manufacturing of a type of family fishing boat has been divided into 5 work elements.
To analyse the efficiency, the production manager performed a work measurement and the
recorded element times for the first five cycles are shown in the following table with a
performance rating (RF) for each element.
Element Cycle 1 Cycle 2 Cycle 3 Cycle 4 Cycle 5 Performance rating % (RF)
1.34
1.68
1.45
1.76
1.52
115
2
2.50
2.75
2.67
2.55
2.45
105
3.11
3.22
3.15
4.21
3.38
110
4
4.11
4.23
4.56
4.22
6.42
90
5
5.51
5.43
5.22
5.34
5.55
120
Note: all element times are recorded in hours.
(a) Based on the times observed through five cycles, determine their normal times for the
cycles and the normal time for the whole job.
(b) Calculate the standard time, if there is a fatigue allowance of 8 % and a contingency
allowance of 7.5%.
(c) If a worker is employed on a 5 day, 37.5 hour/week with 1.5 hours per day for breaks,
how many workers are needed for a daily production of 25?
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![MATLAB: An Introduction with Applications](https://www.bartleby.com/isbn_cover_images/9781119256830/9781119256830_smallCoverImage.gif)
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
![Probability and Statistics for Engineering and th…](https://www.bartleby.com/isbn_cover_images/9781305251809/9781305251809_smallCoverImage.gif)
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
![Statistics for The Behavioral Sciences (MindTap C…](https://www.bartleby.com/isbn_cover_images/9781305504912/9781305504912_smallCoverImage.gif)
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
![MATLAB: An Introduction with Applications](https://www.bartleby.com/isbn_cover_images/9781119256830/9781119256830_smallCoverImage.gif)
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
![Probability and Statistics for Engineering and th…](https://www.bartleby.com/isbn_cover_images/9781305251809/9781305251809_smallCoverImage.gif)
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
![Statistics for The Behavioral Sciences (MindTap C…](https://www.bartleby.com/isbn_cover_images/9781305504912/9781305504912_smallCoverImage.gif)
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
![Elementary Statistics: Picturing the World (7th E…](https://www.bartleby.com/isbn_cover_images/9780134683416/9780134683416_smallCoverImage.gif)
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
![The Basic Practice of Statistics](https://www.bartleby.com/isbn_cover_images/9781319042578/9781319042578_smallCoverImage.gif)
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
![Introduction to the Practice of Statistics](https://www.bartleby.com/isbn_cover_images/9781319013387/9781319013387_smallCoverImage.gif)
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman