Case Part B: Quality Control Analytics As part of the process for improving the quality of their cars, engineers have identified a potential improvement to the process that makes a washer that is used in the accelerator assembly. The tolerances on the thickness of the washer are fairly large since the fit can be loose, but if it does happen to get too large, it can cause the accelerator to bind and create a potential problem for the driver. (Note: This part of the case has been fabricated for teaching purposes.) Let’s assume that as a first step to improving the process, a sample of 40 washers coming from the machine that produces the washers was taken and the thickness measured in millimeters. The following table has the measurements from the sample: 1.9 2.0 1.9 1.8 2.2 1.7 2.0 1.9 1.7 1.8 1.8 2.2 2.1 2.2 1.9 1.8 2.1 1.6 1.8 1.6 2.1 2.4 2.2 2.1 2.1 2.0 1.8 1.7 1.9 1.9 2.1 2.0 2.4 1.7 2.2 2.0 1.6 2.0 2.1 2.2 answer these 2 Questions 6. Set up and range control charts for the current process. Assume the operators will take samples of 10 washers at a time. 7. Plot the data on your control charts. Does the current process appear to be in control?
Case Part B: Quality Control Analytics
As part of the process for improving the quality of their cars, engineers have identified a potential improvement to the process that makes a washer that is used in the accelerator assembly. The tolerances on the thickness of the washer are fairly large since the fit can be loose, but if it does happen to get too large, it can cause the accelerator to bind and create a potential problem for the driver. (Note: This part of the case has been fabricated for teaching purposes.)
Let’s assume that as a first step to improving the process, a sample of 40 washers coming from the machine that produces the washers was taken and the thickness measured in millimeters. The following table has the measurements from the sample:
1.9 2.0 1.9 1.8 2.2 1.7 2.0 1.9 1.7 1.8
1.8 2.2 2.1 2.2 1.9 1.8 2.1 1.6 1.8 1.6
2.1 2.4 2.2 2.1 2.1 2.0 1.8 1.7 1.9 1.9
2.1 2.0 2.4 1.7 2.2 2.0 1.6 2.0 2.1 2.2
answer these 2 Questions
6. Set up and range control charts for the current process. Assume the operators will take samples of 10 washers at a time.
7. Plot the data on your control charts. Does the current process appear to be in control?
![Case Part B: Quality Control Analytics
As part of the process for improving the quality of their cars, engineers have identified a potential improvement to the process that makes a washer that is used in the accelerator assembly. The tolerances on the
thickness of the washer are fairly large since the fit can be loose, but if it does happen to get too large, it can cause the accelerator to bind and create a potential problem for the driver. (Note: This part of the case
has been fabricated for teaching purposes.)
Let's assume that as a first step to improving the process, a sample of 40 washers coming from the machine that produces the washers was taken and the thickness measured in millimeters. The following table
has the measurements from the sample:
1.9 2.0 1.9 1.8 2.2 1.7 2.0 1.9 1.7 1.8
1.8 2.2 2.1 2.2 1.9 1.8 2.1 1.6 1.8 1.6
2.1 2.4 2.2 2.1 2.1 2.0 1.8 1.7 1.9 1.9
2.1 2.0 2.4 1.7 2.2 2.0 1.6 2.0 2.1 2.2](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F8d494b17-8b36-49e0-a6a1-3408f9cee0a7%2F6c405868-6f2c-4ef9-b40e-3c8f5b637410%2Ff9rulmw_processed.png&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 10 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)