Camyo Manufacturing produces four parts that require the use of a lathe and a drillpress. The two machines operate 10 hours a day. The following table provides the time inminutes required by each part: Production time in mins Part Lathe Drill press 1 5 3 2 6 2 3 4 6 4 7 4 It is desired to balance the two machines by limiting thedifference between their total operation times to at most 30 minutes. The market demand for each part is at least 10 units. Additionally, the number of units of part 1 may not exceed that of part 2. Formulate the problem as a GP model
Contingency Table
A contingency table can be defined as the visual representation of the relationship between two or more categorical variables that can be evaluated and registered. It is a categorical version of the scatterplot, which is used to investigate the linear relationship between two variables. A contingency table is indeed a type of frequency distribution table that displays two variables at the same time.
Binomial Distribution
Binomial is an algebraic expression of the sum or the difference of two terms. Before knowing about binomial distribution, we must know about the binomial theorem.
Camyo Manufacturing produces four parts that require the use of a lathe and a drillpress. The two machines operate 10 hours a day. The following table provides the time inminutes required by each part:
Production time in mins | ||
Part | Lathe | Drill press |
1 | 5 | 3 |
2 | 6 | 2 |
3 | 4 | 6 |
4 | 7 | 4 |
It is desired to balance the two machines by limiting thedifference between their total operation times to at most 30 minutes. The market demand for each part is at least 10 units. Additionally, the number of units of part 1 may not exceed that of part 2.
Formulate the problem as a GP model