Calculate the net volume of the grid below in cubic yards using the borrow-pit method. Net volume is calculated as cut volume minus fill volume (all numbers are in ft.) Grid cell side length - 5 Design elevation = 50.00 As-Built elevation of A0: 49 As-Built elevation of A1:52 As-Built elevation of A2: 55 As-Built elevation of B0: 48 As-Built elevation of B1: 50 As-Built elevation of B2: 53 As-Built elevation of CO: 45 As-Built elevation of C1: 47
Calculate the net volume of the grid below in cubic yards using the borrow-pit method. Net volume is calculated as cut volume minus fill volume (all numbers are in ft.) Grid cell side length - 5 Design elevation = 50.00 As-Built elevation of A0: 49 As-Built elevation of A1:52 As-Built elevation of A2: 55 As-Built elevation of B0: 48 As-Built elevation of B1: 50 As-Built elevation of B2: 53 As-Built elevation of CO: 45 As-Built elevation of C1: 47
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 8RQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 3 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,