B 0 D E F G H 1234567820 Project Start 25-May-24 Item No. Task Start End Duration Progress 1.1 CLEARING AND GRUBBING 25-May-24 26-May-24 1 100% 1.2 TEMPORARY FACILITY 26-May-24 1-Jun-24 6 100% 1.3 LAYOUT 1-Jun-24 3-Jun-24 2 100% 11 2.1 STRUCTURAL EXCAVATION - HAND 3-Jun-24 6-Jun-24 3 100% 12 2.2 EMBANKMENT-MANUAL 6-Jun-24 9-Jun-24 3 100% 13 2.3 COMPACTING 9-Jun-24 11-Jun-24 2 100% 14 3.1.1 FOUNDATION - FABRICATION OF STEEL BARS 11-Jun-24 14-Jun-24 3 100% 34 38 5676222222222223323333333 15 3.1.2 FORMWORKS 14-Jun-24 19-Jun-24 5 100% 3.1.3 FABRICATION OF STEEL BARS 19-Jun-24 23-Jun-24 4 100% 3.1.4 FABRICATION OF STEEL BARS 23-Jun-24 27-Jun-24 4 100% 3.1.5 FORMWORKS -SUSPENDED 27-Jun-24 12-Jul-24 15 100% 19 3.1.6 CONCRETING-SUSPENDED 12-Jul-24 24-Jul-24 12 100% 3.1.8 3.1.9 CONCRETING-GRADE ERRECTION-LIGHT 24-Jul-24 2-Aug-24 9 100% 2-Aug-24 5-Aug-24 3 100% 3.1.10 TRUSS FABRICATION 5-Aug-24 9-Aug-24 4 100% 3.1.11 TRUSS INSTALLATION 9-Aug-24 12-Aug-24 3 100% 24 3.1.12 PURLINS INSTALLATION 12-Aug-24 15-Aug-24 3 100% 3.1.13 STAIRS 15-Aug-24 20-Aug-24 5 100% 4.2 4.1 LAYING PLASTERING 20-Aug-24 22-Aug-24 2 100% 22-Aug-24 24-Aug-24 2 100% 5.1 WOODEN DOORS 24-Aug-24 4-Sep-24 11 100% 5.2 GLASS WINDOWS 4-Sep-24 18-Sep-24 14 100% 698 7 30 5.3 FLOOR TILES PAINTING PLUMBING 18-Sep-24 2-Oct-24 14 100% 2-Oct-24 23-Oct-24 21 100% 23-Oct-24 7-Nov-24 15 100% ELECTRICAL use this format 0 0 0 START 0 0 0 7-Nov-24 22-Nov-24 15 100%

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%

Please make a PERT CPM use the activity and duration below. Also use the format stated.

PLEASE DON'T ANSWER IF YOU DON'T KNOW HOW. Thank you.

B
0
D
E
F
G
H
1234567820
Project Start
25-May-24
Item No. Task
Start
End
Duration Progress
1.1
CLEARING AND GRUBBING
25-May-24 26-May-24
1
100%
1.2
TEMPORARY FACILITY
26-May-24
1-Jun-24
6
100%
1.3
LAYOUT
1-Jun-24 3-Jun-24
2
100%
11
2.1
STRUCTURAL EXCAVATION - HAND
3-Jun-24
6-Jun-24
3
100%
12
2.2
EMBANKMENT-MANUAL
6-Jun-24 9-Jun-24
3
100%
13
2.3
COMPACTING
9-Jun-24 11-Jun-24
2
100%
14
3.1.1
FOUNDATION - FABRICATION OF STEEL BARS
11-Jun-24 14-Jun-24
3
100%
34
38
5676222222222223323333333
15
3.1.2
FORMWORKS
14-Jun-24 19-Jun-24
5
100%
3.1.3
FABRICATION OF STEEL BARS
19-Jun-24 23-Jun-24
4
100%
3.1.4
FABRICATION OF STEEL BARS
23-Jun-24 27-Jun-24
4
100%
3.1.5
FORMWORKS -SUSPENDED
27-Jun-24 12-Jul-24
15
100%
19
3.1.6
CONCRETING-SUSPENDED
12-Jul-24
24-Jul-24
12
100%
3.1.8
3.1.9
CONCRETING-GRADE
ERRECTION-LIGHT
24-Jul-24
2-Aug-24
9
100%
2-Aug-24 5-Aug-24
3
100%
3.1.10 TRUSS FABRICATION
5-Aug-24 9-Aug-24
4
100%
3.1.11 TRUSS INSTALLATION
9-Aug-24 12-Aug-24
3
100%
24
3.1.12 PURLINS INSTALLATION
12-Aug-24 15-Aug-24
3
100%
3.1.13 STAIRS
15-Aug-24 20-Aug-24
5
100%
4.2
4.1 LAYING
PLASTERING
20-Aug-24 22-Aug-24
2
100%
22-Aug-24 24-Aug-24
2
100%
5.1
WOODEN DOORS
24-Aug-24 4-Sep-24
11
100%
5.2
GLASS WINDOWS
4-Sep-24 18-Sep-24
14
100%
698
7
30
5.3 FLOOR TILES
PAINTING
PLUMBING
18-Sep-24 2-Oct-24
14
100%
2-Oct-24 23-Oct-24
21
100%
23-Oct-24 7-Nov-24
15
100%
ELECTRICAL
use this format
0
0
0
START
0
0
0
7-Nov-24 22-Nov-24
15
100%
Transcribed Image Text:B 0 D E F G H 1234567820 Project Start 25-May-24 Item No. Task Start End Duration Progress 1.1 CLEARING AND GRUBBING 25-May-24 26-May-24 1 100% 1.2 TEMPORARY FACILITY 26-May-24 1-Jun-24 6 100% 1.3 LAYOUT 1-Jun-24 3-Jun-24 2 100% 11 2.1 STRUCTURAL EXCAVATION - HAND 3-Jun-24 6-Jun-24 3 100% 12 2.2 EMBANKMENT-MANUAL 6-Jun-24 9-Jun-24 3 100% 13 2.3 COMPACTING 9-Jun-24 11-Jun-24 2 100% 14 3.1.1 FOUNDATION - FABRICATION OF STEEL BARS 11-Jun-24 14-Jun-24 3 100% 34 38 5676222222222223323333333 15 3.1.2 FORMWORKS 14-Jun-24 19-Jun-24 5 100% 3.1.3 FABRICATION OF STEEL BARS 19-Jun-24 23-Jun-24 4 100% 3.1.4 FABRICATION OF STEEL BARS 23-Jun-24 27-Jun-24 4 100% 3.1.5 FORMWORKS -SUSPENDED 27-Jun-24 12-Jul-24 15 100% 19 3.1.6 CONCRETING-SUSPENDED 12-Jul-24 24-Jul-24 12 100% 3.1.8 3.1.9 CONCRETING-GRADE ERRECTION-LIGHT 24-Jul-24 2-Aug-24 9 100% 2-Aug-24 5-Aug-24 3 100% 3.1.10 TRUSS FABRICATION 5-Aug-24 9-Aug-24 4 100% 3.1.11 TRUSS INSTALLATION 9-Aug-24 12-Aug-24 3 100% 24 3.1.12 PURLINS INSTALLATION 12-Aug-24 15-Aug-24 3 100% 3.1.13 STAIRS 15-Aug-24 20-Aug-24 5 100% 4.2 4.1 LAYING PLASTERING 20-Aug-24 22-Aug-24 2 100% 22-Aug-24 24-Aug-24 2 100% 5.1 WOODEN DOORS 24-Aug-24 4-Sep-24 11 100% 5.2 GLASS WINDOWS 4-Sep-24 18-Sep-24 14 100% 698 7 30 5.3 FLOOR TILES PAINTING PLUMBING 18-Sep-24 2-Oct-24 14 100% 2-Oct-24 23-Oct-24 21 100% 23-Oct-24 7-Nov-24 15 100% ELECTRICAL use this format 0 0 0 START 0 0 0 7-Nov-24 22-Nov-24 15 100%
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning