At the end of June, the job cost sheets at Ace Roofers show the following costs accumulated on three jobs. Job 7 $28,600 24,200 12,100 Job 5 $ 18, 200 11, 200 5,600 At June 30 Direct materials: Direct labor Overhead applied Additional Information a. Job 5 was started in May, and the following costs were assigned to it in May: direct materials, $7,600; direct labor, $3,400; and applied overhead, $2,500. Job 5 was finished in June. D. Job 6 and Job 7 were started in June; Job 6 was finished in June, and Job 7 is to be completed in July. =. Overhead cost is applied with a predetermined rate based on direct labor cost. The predetermined overhead rate did Job 6 $ 34,600 17,400 8,700
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps