At hydroelectric electric power plant site, available head and flow rate are 12 m and 6m3/s respectively. If the turbine to be installed is required to run at 2 rev/sec with an over-all efficiency of 60%. Determine the suitable type of turbine for this site ?

icon
Related questions
Question
Please do it fast it urgent
At hydroelectric
electric power plant site,
available head and flow rate are 12 m and 6m3/s
respectively. If the turbine to be installed is
required to run at 2 rev/sec with an over-all
efficiency of 60%. Determine the suitable type of
turbine for this site ?
Transcribed Image Text:At hydroelectric electric power plant site, available head and flow rate are 12 m and 6m3/s respectively. If the turbine to be installed is required to run at 2 rev/sec with an over-all efficiency of 60%. Determine the suitable type of turbine for this site ?