At a river a suitable site for a run-of-the river installation has an available head of 13 m between the water intake and the turbine house. Environmental guidelines permit to extract water for hydropower only if it is in excess of 2.8 m3/s. Estimate the power generated in kW when the flow in the river is 10.9 m3/s for a turbine with an efficiency of 90%. Present the answer as integer in kW.
At a river a suitable site for a run-of-the river installation has an available head of 13 m between the water intake and the turbine house. Environmental guidelines permit to extract water for hydropower only if it is in excess of 2.8 m3/s. Estimate the power generated in kW when the flow in the river is 10.9 m3/s for a turbine with an efficiency of 90%. Present the answer as integer in kW.
Sustainable Energy
2nd Edition
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:DUNLAP, Richard A.
Chapter18: Energy Storage
Section: Chapter Questions
Problem 20P
Related questions
Question
Read the question carefully and give me right solution with clear calculations.
Note: If you don't know the solution please leave it but don't give me wrong solution.
At a river a suitable site for a run-of-the river installation has an available head of 13 m between the water intake and the turbine house. Environmental guidelines permit to extract water for hydropower only if it is in excess of 2.8 m3/s. Estimate the power generated in kW when the flow in the river is 10.9 m3/s for a turbine with an efficiency of 90%. Present the answer as integer in kW.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you