As part of port expansion project, a temporary vertical cut is to be made in a submerged clay deposit. A cross section and soil parameters are shown below. (Note: if needed, you can use a single wedge failure mechanism with an inclination of 45° for the failure surface) Clay c = 450 psf, o = 0° y = 100 pcf H. Note: the slope is submerged a) How deep can you make the cut with a factor of safety of = 1.5 for temporary construction? b) If the project was abandoned after the vertical cut was made, would you still expect the vertical cut to be standing 20 years? Why or why not? Support your answer with calculation.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
As part of port expansion project, a temporary vertical cut is to be made in a submerged clay
deposit. A cross section and soil parameters are shown below.
(Note: if needed, you can use a single wedge failure mechanism with an inclination of 45° for the
failure surface)
Clay
c = 450 psf, o = 0°
Y = 100 pcf
H
Note: the slope is submerged
a) How deep can you make the cut with a factor of safety of = 1.5 for temporary construction?
b) If the project was abandoned after the vertical cut was made, would you still expect the
vertical cut to be standing 20 years? Why or why not? Support your answer with
calculation.
Transcribed Image Text:As part of port expansion project, a temporary vertical cut is to be made in a submerged clay deposit. A cross section and soil parameters are shown below. (Note: if needed, you can use a single wedge failure mechanism with an inclination of 45° for the failure surface) Clay c = 450 psf, o = 0° Y = 100 pcf H Note: the slope is submerged a) How deep can you make the cut with a factor of safety of = 1.5 for temporary construction? b) If the project was abandoned after the vertical cut was made, would you still expect the vertical cut to be standing 20 years? Why or why not? Support your answer with calculation.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Calculation of settlement
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning