As a production manager for RMC, what do you recommend? Why?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Rochester Manufacturing’s Process Decision - Process Strategy

Rochester Manufacturing Corporation (RMC) is considering moving some of its production from traditional numerically controlled machines to a flexible manufacturing system (FMS). Its computer numerical control machines have been operating in a high-variety, low-volume manner. Machine utilization, as near as it can determine, is hovering around 10%. The machine tool sales people and a consulting firm want to put the machines together in an FMS. They believe that a $3 million expenditure on machinery and the transfer machines  will handle about 30% of RMC’s work. There will, of course, be transition and start up costs in addition to this.

 

The firm has not yet entered all its parts into a comprehensive group technology system, but believes that the 30% is a good estimate of products suitable for the FMS. This 30% should fit very nicely into a “family.” A reduction, because of higher utilization, should take place in the number of pieces of machinery. The firm should be able to go from 15 to about 4 machines, and personnel should go from 15 to perhaps as low as 3. Similarly, floor space reduction will

 

 

 

go from 20,000 square feet to about 6,000. Throughput of orders should also improve with processing of this family of parts in 1 to 2 days rather than 7 to 10. Inventory reduction is estimated to yield a one-time $750,000 savings, and annual labor savings should be in the neighborhood of $300,000.

 

Although the projections all look very positive, an analysis of the project’s return on investment showed it to be between 10% and 15% per year. The company has traditionally had an expectation that projects should yield well over 15% and have payback periods of substantially less than 5 years.

 

  1. As a production manager for RMC, what do you recommend? Why?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.