Answer with Solution. (box the final answer) 1. The amount of paint p Formulas: p k = A/p = kA needed to paint the wall of Mini Park (VNHS) varies directly as the area A of the wall. If 2 gallons of paint is needed to paint a 40 sq meter wall, how many gallons of paint are needed to paint a wall with an area of 100 square meters?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
ACTIVITY 4:
Solve the given problem below.
Answer with Solution. (box the final answer)
1. The amount of paint
kA ; k= A/p
Formulas:
p =
needed to paint the wall of
Mini Park (VNHS) varies
directly as the area A of the
wall. If 2 gallons of paint is
needed to paint a 40 sq meter
wall, how many gallons of
paint are needed to paint a
wall with an
area of 100
square meters?
Answer with Solution. (box the final answer)
Formulas: d = k/m; k=
dm
2. The number of days d
repair
(VNHS)
inversely as the number
men m working. It takes 15
days for 2 men to repair the
garden. How many men are
to complete the job
needed
to
Math
Garden
varies
of
needed
for 6 days?
Answer with Solution. (box the final answer)
Formulas: F = km/d? ; k= Fd² / m
3. The force of attraction, F
of a body varies directly as
and inversely
its mass
m
as the square of the distance
d from
the
body. When
8 kg and d = 5 meters,
m
F =
100 Newton.
Find F
when m =
2 kg and d
15
meters.
Transcribed Image Text:ACTIVITY 4: Solve the given problem below. Answer with Solution. (box the final answer) 1. The amount of paint kA ; k= A/p Formulas: p = needed to paint the wall of Mini Park (VNHS) varies directly as the area A of the wall. If 2 gallons of paint is needed to paint a 40 sq meter wall, how many gallons of paint are needed to paint a wall with an area of 100 square meters? Answer with Solution. (box the final answer) Formulas: d = k/m; k= dm 2. The number of days d repair (VNHS) inversely as the number men m working. It takes 15 days for 2 men to repair the garden. How many men are to complete the job needed to Math Garden varies of needed for 6 days? Answer with Solution. (box the final answer) Formulas: F = km/d? ; k= Fd² / m 3. The force of attraction, F of a body varies directly as and inversely its mass m as the square of the distance d from the body. When 8 kg and d = 5 meters, m F = 100 Newton. Find F when m = 2 kg and d 15 meters.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,