An underground telephone cable is to be laid between two boat docks on opposite banks of a straight river. One boathouse is 340 meters downstream from the other. The river is 320 meters wide. If the cost of laying the cable is $60 per meter under water and $50 per meter on land, what is the lowest possible cost of laying the cable between the boathouses? Round your answer to the nearest dollar. minimal cost of cable: $
Contingency Table
A contingency table can be defined as the visual representation of the relationship between two or more categorical variables that can be evaluated and registered. It is a categorical version of the scatterplot, which is used to investigate the linear relationship between two variables. A contingency table is indeed a type of frequency distribution table that displays two variables at the same time.
Binomial Distribution
Binomial is an algebraic expression of the sum or the difference of two terms. Before knowing about binomial distribution, we must know about the binomial theorem.
An underground telephone cable is to be laid between two boat docks on opposite banks of a straight river. One boathouse is 340 meters downstream from the other. The river is 320 meters wide. If the cost of laying the cable is $60 per meter under water and $50 per meter on land, what is the lowest possible cost of laying the cable between the boathouses? Round your answer to the nearest dollar.
minimal cost of cable: $
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 4 images