An underground storage tank has discharged diesel fuel into groundwater. A drinking-water well is located 200 m downgradient from the fuel spill. To ensure the safety of the drinking-water supply, a monitoring well is drilled halfway between the drinking-water well and the fuel spill. The difference in hydraulic head between the drinking-water well and the monitoring well is 40 cm (with the head in the monitoring well higher). If the porosity is 39 percent and hydraulic conductivity is 45 m/day, how long after the contaminated water reaches the monitoring well would it reach the drinking-water well? Assume the pollutants move at the same speed as the groundwater. Answer: 217 d
An underground storage tank has discharged diesel fuel into groundwater. A drinking-water well is located 200 m downgradient from the fuel spill. To ensure the safety of the drinking-water supply, a monitoring well is drilled halfway between the drinking-water well and the fuel spill. The difference in hydraulic head between the drinking-water well and the monitoring well is 40 cm (with the head in the monitoring well higher). If the porosity is 39 percent and hydraulic conductivity is 45 m/day, how long after the contaminated water reaches the monitoring well would it reach the drinking-water well? Assume the pollutants move at the same speed as the groundwater. Answer: 217 d
Trending now
This is a popular solution!
Step by step
Solved in 3 steps