An operator wants to make a production planning that will minimize the changing costs of the machine (such as fuel, oil, repair-maintenance, machine labor) with the tractor and machine set he has. Since the cultivation areas of field crops that can be cultivated in the region where the enterprise has a size of W / 100 (ha) are shown with the decision variables X1, X2, X3 and X4 as ha, when it is desired to create a time-limited linear programming model that will minimize the machine costs of the enterprise using the information given below; Decision variable | Machine variable Machine hour requirement (h / ha) II.PERÍOD I.PERİOD III.PERİOD expense (TL / ha) 76000 15200 3,6 6,1 6,5 9,8 The workable time values are calculated as 5700 h for the first period, 1520 h for the 6,3 8,4 9,5 5,2 X1 5,2 2,7 X2 X3 19000 Х4 95000 second period and 9500 h for the third period. a. Purpose function to minimize machine changing costs: a. Constraint equations for periodic machine (tractor) hour requirements :

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Topic Video
Question
An operator wants to make a production planning that will minimize the changing costs of the
machine (such as fuel, oil, repair-maintenance, machine labor) with the tractor and machine
set he has. Since the cultivation areas of field crops that can be cultivated in the region where
the enterprise has a size of W/ 100 (ha) are shown with the decision variables X1, X2, X3 and
X4 as ha, when it is desired to create a time-limited linear programming model that will
minimize the machine costs of the enterprise using the information given below;
Decision
Machine hour requirement (h / ha)
II.PERÍOD
Machine
variable
variable
I.PERİOD
III.PERIOD
expense (TL /
ha)
3,6
6,1
6,5
9,8
- The workable time values are calculated as 5700 h for the first period, 1520 h for the
X1
76000
6,3
8,4
9,5
5,2
5,2
2,7
X2
15200
X3
19000
X4
95000
second period and 9500 h for the third period.
a. Purpose function to minimize machine changing costs:
a. Constraint equations for periodic machine (tractor) hour requirements :
b. Equation expressing the business land constraint :
Transcribed Image Text:An operator wants to make a production planning that will minimize the changing costs of the machine (such as fuel, oil, repair-maintenance, machine labor) with the tractor and machine set he has. Since the cultivation areas of field crops that can be cultivated in the region where the enterprise has a size of W/ 100 (ha) are shown with the decision variables X1, X2, X3 and X4 as ha, when it is desired to create a time-limited linear programming model that will minimize the machine costs of the enterprise using the information given below; Decision Machine hour requirement (h / ha) II.PERÍOD Machine variable variable I.PERİOD III.PERIOD expense (TL / ha) 3,6 6,1 6,5 9,8 - The workable time values are calculated as 5700 h for the first period, 1520 h for the X1 76000 6,3 8,4 9,5 5,2 5,2 2,7 X2 15200 X3 19000 X4 95000 second period and 9500 h for the third period. a. Purpose function to minimize machine changing costs: a. Constraint equations for periodic machine (tractor) hour requirements : b. Equation expressing the business land constraint :
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Optimization
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,