An industrial facility operating 24 hours a day throughout the week consumes 2.8 million kWh of electricity in April. The demand varied between 3500 kW and 6500 kW during that month. The electrical load supplied by the utility has fluctuated between 2500 kW and 7400 kW during the previous 11 months. Tue demand billing for a given month is based on 60 percent of peak demand in the previous 11 months. The unit price of electricity is $0.21/kWh, and the demand charge is $16/kW. Determine (a) the load factor, (b) the consumption charge, and (c) the demand charge for the month of April.

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question
Kindly do it correctly and handwritten only and do urself
An industrial facility operating 24 hours a
day throughout the week consumes 2.8
million kWh of electricity in April. The
demand varied between 3500 kW and 6500
kW during that month. The electrical load
supplied by the utility has fluctuated
between 2500 kW and 7400 kW during the
previous 11 months. Tue demand billing for
a given month is based on 60 percent of
peak demand in the previous 11 months.
The unit price of electricity is $0.21/kWh,
and the demand charge is $16/kW.
Determine (a) the load factor, (b) the
consumption charge, and (c) the demand
charge for the month of April.
Transcribed Image Text:An industrial facility operating 24 hours a day throughout the week consumes 2.8 million kWh of electricity in April. The demand varied between 3500 kW and 6500 kW during that month. The electrical load supplied by the utility has fluctuated between 2500 kW and 7400 kW during the previous 11 months. Tue demand billing for a given month is based on 60 percent of peak demand in the previous 11 months. The unit price of electricity is $0.21/kWh, and the demand charge is $16/kW. Determine (a) the load factor, (b) the consumption charge, and (c) the demand charge for the month of April.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Digital Modulation Scheme (Amplitude-Shift Keying [ASK], Phase-Shift Keying [PSK], Frequency-Shift Keying [FSK])
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,