An army that overhauls ground mobile radar systems is interested in improving its processes. One problem involves troubleshooting a particular component that has a high failure rate after it has been repaired and reinstalled in the system. The shop floor supervisor believes that having standard work procedures in place will reduce the time required for troubleshooting this component. Time (in minutes) required troubleshooting this component without and with the standard work procedure is recorded for a sample of 19 employess. In order to determine if having a standard work procedure in place reduces troubleshooting time, they should use: a test of two proportions a two-tailed test of two independent means. a one-tailed test of two indepedent means. a two-tailed paired t-test. a one-tailed paired t-test
An army that overhauls ground mobile radar systems is interested in improving its processes. One problem involves troubleshooting a particular component that has a high failure rate after it has been repaired and reinstalled in the system. The shop floor supervisor believes that having standard work procedures in place will reduce the time required for troubleshooting this component. Time (in minutes) required troubleshooting this component without and with the standard work procedure is recorded for a sample of 19 employess. In order to determine if having a standard work procedure in place reduces troubleshooting time, they should use:
a test of two proportions
a two-tailed test of two independent
a one-tailed test of two indepedent means.
a two-tailed paired t-test.
a one-tailed paired t-test
Step by step
Solved in 2 steps