Along a proposed road in Camp 2 Tuba Benguet, the volumes of earthwork between Successive crosssections 50 m apart are given in the table. Plot a mass-haul diagram for chainage 5000 to 5600, assuming that the earthworks were balanced at chainage 5000. The positive volumes denote cut and the negative volumes denote fill. Draw the balancing lines for the following cases: a) Balance of earthworks at chainage 5000 and barrow at chainage 5600. b) Equal barrow at chainages 5000 and 5600. Determine the costs of earthworks in the above two cases using the rates as under: a) Excavate, cart, and fill within a free-haul distance of 200 m (PhP 10.00/ m³) b) Excavate, cart, and fill for overhaul (PhP 15.00/ m³) c) Barrow and fill at chainage 5000 (PhP 20.00/ m³) d) Barrow and fill at chain age 5600 (PhP 25.00/ m³)

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%

KINDLY DRAW THE APPROPRIATE ILLUSTRATION FOR THIS PROBLEM. PROVIDE CORRECT ANSWER WITH DETAILED SOLUTION. PLEASE ANSWER

Along a proposed road in Camp 2 Tuba Benguet, the volumes of earthwork between
SUccessive crosssections 50 m apart are given in the table. Plot a mass-haul diagram for
chainage 5000 to 5600, assuming that the earthworks were balanced at chainage
5000. The positive volumes denote cut and the negative volumes denote fill. Draw the
balancing lines for the following cases:
a) Balance of earthworks at chainage 5000 and barrow at chainage 5600.
b) Equal barrow at chainages 5000 and 5600.
Determine the costs of earthworks in the above two cases using the rates as under:
a) Excavate, cart, and fill within a free-haul distance of 200 m (PhP 10.00/ m³)
b) Excavate, cart, and fill for overhaul (PhP 15.00/ m³)
c) Barrow and fill at chainage 5000 (PhP 20.00/ m³)
d) Barrow and fill at chain age 5600 (PhP 25.00/ m³)
CHAINAGE (m)
VOLUME (m³)
5000
5050
-2100
5100
-2400
5150
-1500
5200
+1800
5250
+2200
5300
+2100
5350
+1700
5400
+1300
5450
+300
5500
-600
5550
-2300
5600
-2500
SAPIE
Transcribed Image Text:Along a proposed road in Camp 2 Tuba Benguet, the volumes of earthwork between SUccessive crosssections 50 m apart are given in the table. Plot a mass-haul diagram for chainage 5000 to 5600, assuming that the earthworks were balanced at chainage 5000. The positive volumes denote cut and the negative volumes denote fill. Draw the balancing lines for the following cases: a) Balance of earthworks at chainage 5000 and barrow at chainage 5600. b) Equal barrow at chainages 5000 and 5600. Determine the costs of earthworks in the above two cases using the rates as under: a) Excavate, cart, and fill within a free-haul distance of 200 m (PhP 10.00/ m³) b) Excavate, cart, and fill for overhaul (PhP 15.00/ m³) c) Barrow and fill at chainage 5000 (PhP 20.00/ m³) d) Barrow and fill at chain age 5600 (PhP 25.00/ m³) CHAINAGE (m) VOLUME (m³) 5000 5050 -2100 5100 -2400 5150 -1500 5200 +1800 5250 +2200 5300 +2100 5350 +1700 5400 +1300 5450 +300 5500 -600 5550 -2300 5600 -2500 SAPIE
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Engineering drawing
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning