ADVANCED MATH (Please "write" the solutions leigibly and correctly. No long explanation needed. Rate will be given) John Smith works for an investment company and is currently negotiating with three potential investors. The company offers two types of investment instrument available for new investors. Instrument alpha pays 10% anually. Instrument beta, on the other hand, pays 20% anually. Investors are allowed to divide their investments between these instruments such that a desired range ot total return between 10% to 20% is acheved. Suppose that the total investment that the total investment of investor 1, investor 2, and investor 3, is Php20,000, Php50,000 and Php10,000, respectively. How much should each investor put money into each instrument? Investor 1: Instrument alpha = Php                       ? Instrument beta = Php                         ?   Investor 2: Instrument alpha = Php25,000 Instrument beta = Php25,000   Investor 3: Instrument alpha = Php                          ? Instrument beta = Php                            ?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

ADVANCED MATH (Please "write" the solutions leigibly and correctly. No long explanation needed. Rate will be given)

John Smith works for an investment company and is currently negotiating with three potential investors. The company offers two types of investment instrument available for new investors. Instrument alpha pays 10% anually. Instrument beta, on the other hand, pays 20% anually. Investors are allowed to divide their investments between these instruments such that a desired range ot total return between 10% to 20% is acheved. Suppose that the total investment that the total investment of investor 1, investor 2, and investor 3, is Php20,000, Php50,000 and Php10,000, respectively. How much should each investor put money into each instrument?

Investor 1:

Instrument alpha = Php                       ?

Instrument beta = Php                         ?

 

Investor 2:

Instrument alpha = Php25,000

Instrument beta = Php25,000

 

Investor 3:

Instrument alpha = Php                          ?

Instrument beta = Php                            ?

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question

Hi please verify these answers with proper computation. No long explanation. 

Solution
Bartleby Expert
SEE SOLUTION
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,