Activity 4A: I conduct performance ratings for two employees of the same nature of work using the Westinghouse Rating System. The observed time for an operator to finish a task which is tightening of screws for 2 minutes. His ratings were noted, as follows: Good skill, C1 + 0.06 Excellent Efforts, B1 + 0.08 Average condition, C + 0.02 Good consistency, C + 0.01 Total Westinghouse Rating + 0.17 The normal time for that operation would be = 2.0 x 1.17 = 2.34 min. To find the standard time at 20% allowance, = 2.34 x 100 = 2.92 min. (100 – 20) Explain. Be able to describe your basis, or give comments, on how you came up with their total rating. Set the standard time at 20% allowance.
Activity 4A:
I conduct performance ratings for two employees of the same nature of work using the Westinghouse Rating System.
The observed time for an operator to finish a task which is tightening of screws for 2 minutes. His ratings were noted, as follows:
Good skill, C1 + 0.06
Excellent Efforts, B1 + 0.08
Average condition, C + 0.02
Good consistency, C + 0.01
Total Westinghouse Rating + 0.17
The normal time for that operation would be = 2.0 x 1.17 = 2.34 min.
To find the standard time at 20% allowance,
= 2.34 x 100 = 2.92 min.
(100 – 20)
Explain.
Be able to describe your basis, or give comments, on how you came up with their total rating. Set the standard time at 20% allowance.
![Conditions
Ideal
A-+ 0.06
Skill
Effort
Consistency
Perfect
Super
AI -+ 0.15
A2 - + 0.13
Excellent
Excessive
Al-+ 0.13
A2-+ 0.12
Excellent
A -+ 0.04
Excellent
B-+ 0.03
Excellent
B1 -+ 0.10
B2 -+0.08
B-+ 0.04
B1 -+ 0.11
B2 -+ 0.08
Good
Good
C-+ 0.0O
Good
Good
CI - + 0.06
C2 - + 0.03
C=+ 0.00
CI - + 0.OS
C2 - + 0.02
Average
Average
D- 0.00
D- 0.00
Fair
El -- 0.04
Average
D- 0.00
Fair
Average
D- 0.00
Fair
Fair
E--0.03
E-- 0.02
El -- 0.0s
E2 -- 0.1o
E2 -
0.08
Poor
Poor
Poor
Poor
F -- 0.07
F-- 0.04
F1 -- 0.16
F2 -- 0.22
FI -- 0.12
F2 -- 0.17
Note: Correction on Conditions, C = 0.02; Consistency, C = 0.01
Summarized formula for calculation:
Westinghouse rating = Sum of ratings,
i.e. rating of (Skill + Effort + Conditions + Consistency) as given in Westinghouse tables.
Rating Factor = 1 ± Westinghouse Rating
Normal Time = Observed time x Rating factor
100
Standard Time = Normal Time x (100 – Total allowances in percentage)
-](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fd266ae76-d36f-4a40-b8b3-0ee9ebe481a1%2Fd21cd70d-e19b-431d-958f-081a6f796b68%2Fv5jlzvi_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 3 steps with 3 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)