(Acquisition Costs of Realty) Martin Buber Co. purchased land as a factory site for $400,000. The process of tearing down two old buildings on the site and constructing the factory required 6 months. The company paid $42,000 to raze the old buildings and sold salvaged lumber and brick for $6,300. Legal fees of $1,850 were paid for title investigation and drawing the purchase contract. Martin Buber paid $2,200 to an engineering firm for a land survey, and $68,000 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insuranceon the property cost $1,500, and a liability insurance premium paid during construction was $900. The contractor’s charge for construction was $2,740,000. The company paid the contractor in two installments: $1,200,000 at the end of 3 months and $1,540,000 upon completion. Interest costs of $170,000 were incurred to finance the construction.InstructionsDetermine the cost of the land and the cost of the building as they should be recorded on the books of Martin Buber Co. Assume that the land survey was for the building.
Depreciation Methods
The word "depreciation" is defined as an accounting method wherein the cost of tangible assets is spread over its useful life and it usually denotes how much of the assets value has been used up. The depreciation is usually considered as an operating expense. The main reason behind depreciation includes wear and tear of the assets, obsolescence etc.
Depreciation Accounting
In terms of accounting, with the passage of time the value of a fixed asset (like machinery, plants, furniture etc.) goes down over a specific period of time is known as depreciation. Now, the question comes in your mind, why the value of the fixed asset reduces over time.
(Acquisition Costs of Realty) Martin Buber Co. purchased land as a factory site for $400,000. The process of tearing down two old buildings on the site and constructing the factory required 6 months. The company paid $42,000 to raze the old buildings and sold salvaged lumber and brick for $6,300. Legal fees of $1,850 were paid for title investigation and drawing the purchase contract. Martin Buber paid $2,200 to an engineering firm for a land survey, and $68,000 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance
on the property cost $1,500, and a liability insurance premium paid during construction was $900. The contractor’s charge for construction was $2,740,000. The company paid the contractor in two installments: $1,200,000 at the end of 3 months and $1,540,000 upon completion. Interest costs of $170,000 were incurred to finance the construction.
Instructions
Determine the cost of the land and the cost of the building as they should be recorded on the books of Martin Buber Co. Assume that the land survey was for the building.