A.) What is the MINIMUM number of CHB units required for the Septic Tank EXTERIOR WALLS? B) What is the minimum number of CHB units required for the partition wall? c) How many 6m length x D10mm rebars are required to support the EXTERIOR WALL, of the septic tank? D) What is the minimum number of required 40kg-Cement bags for the septic tank slab-on-fill if the factor to be used in the computation is 5-bags per cubic meter of concrete? E) How many cubic meters of GRAVEL is required as "gravel Lining" for the septic-slab-on-fill if the gravel fill thickness to be used is 75mm F) How may lengths of D12mm rebar is required to fulfill the rebar requirement of the slab-on-fill? (one way slab only) G) How many pcs of 4' x 8' plywood form is required for the top slab of the septic tank?
A.) What is the MINIMUM number of CHB units required for the Septic Tank EXTERIOR WALLS?
B) What is the minimum number of CHB units required for the partition wall?
c) How many 6m length x D10mm rebars are required to support the EXTERIOR WALL, of the septic tank?
D) What is the minimum number of required 40kg-Cement bags for the septic tank slab-on-fill if the factor to be used in the computation is 5-bags per cubic meter of concrete?
E) How many cubic meters of GRAVEL is required as "gravel Lining" for the septic-slab-on-fill if the gravel fill thickness to be used is 75mm
F) How may lengths of D12mm rebar is required to fulfill the rebar requirement of the slab-on-fill? (one way slab only)
G) How many pcs of 4' x 8' plywood form is required for the top slab of the septic tank?