A.) What is the MINIMUM number of CHB units required for the Septic Tank EXTERIOR WALLS? B) What is the minimum number of CHB units required for the partition wall? c) How many 6m length x D10mm rebars are required to support the EXTERIOR WALL, of the septic tank? D) What is the minimum number of required 40kg-Cement bags for the septic tank slab-on-fill if the factor to be used in the computation is 5-bags per cubic meter of concrete? E) How many cubic meters of GRAVEL is required as "gravel Lining" for the septic-slab-on-fill if the gravel fill thickness to be used is 75mm F) How may lengths of D12mm rebar is required to fulfill the rebar requirement of the slab-on-fill? (one way slab only) G) How many pcs of 4' x 8' plywood form is required for the top slab of the septic tank?
A.) What is the MINIMUM number of CHB units required for the Septic Tank EXTERIOR WALLS?
B) What is the minimum number of CHB units required for the partition wall?
c) How many 6m length x D10mm rebars are required to support the EXTERIOR WALL, of the septic tank?
D) What is the minimum number of required 40kg-Cement bags for the septic tank slab-on-fill if the factor to be used in the computation is 5-bags per cubic meter of concrete?
E) How many cubic meters of GRAVEL is required as "gravel Lining" for the septic-slab-on-fill if the gravel fill thickness to be used is 75mm
F) How may lengths of D12mm rebar is required to fulfill the rebar requirement of the slab-on-fill? (one way slab only)
G) How many pcs of 4' x 8' plywood form is required for the top slab of the septic tank?
![12mm THK. SLAB COVER WITH 10mmo RS8,
SPACED EVERY 200mm O.C., B.W.
3000
1200
600
600
150
INLET o
MANHOLE
MANHO
150
16mmo RS8 AT EVERY
CORNER AND CHB JOINTS.
PLAN
12mm THK. SLAB COVER WITH 12mmo RSB.
SPACED EVERY 250mm 0.C. B.W.
12mmo BAR
LIFTING HANDLE
3000
1200
600
600
120
300mm. AIR SPACE
WATER LEVEL
INLET
WATERLEVEL
WATEREVEL
OUTLET
ro rVC rE AND iNos
DIGESTIVE
CHAMBER
LEACHING
LEACHING
CHAMBER
CHAMBER
USEF CH WIH 1O
VERTICAL BARS SPACED
A00mm AND HORIONTAL
BARSO EVERY 3LAYERS.
OROPE
150
1 Smm THK. SLAB ON FILL WITH 12mmo RSB,
SPACED EVERY 250mm O.C. B.W.
OSL
OSL
150
150
0001
00€
00SL
2070](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F704c00ff-7297-4c33-ab3c-0c89dee830fb%2F437a5488-05a9-45fe-9639-c8df635df752%2F3uiva_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)