A traverse survey was performed and the following data was recorded. I.S. TGT F/S HORIZ.CIRCLE SIDE LENGTH (m) L/R 106-47-00 АВ 502.2 L/R L/R 163-40-00 247-16-00 BC CD 421.3 В 318.2 L/R 004-44-00 029-21-00 177-38-00 DE 215.4 L/R EA 1049.0 L/R L/R 341-56-00 L/R L/R L/R 137-07-00 081-27-00 143-36-00 A Assuming a local origin at A(0,0) and direction A-B as the local North, calculate the following (in tabular form): (a) the reduced angles for each traverse station. (b) the whole circle bearings for the sides of the traverse. (c) the Northings and Eastings of each station. (d) report the misclosure in latitude and departure. Ow A CBDCED SAABBCCDOEE

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
ACET208 SURVEYING II - TRAVERSING EXAMPLES
QUESTION 1
A traverse survey was performed and the following data was recorded.
HORIZ.CIRCLE
106-47-00
I.S.
TGT
F/S
SIDE
LENGTH (m)
A
L/R
AB
502.2
A
B
L/R
BC
CD
DE
EA
163-40-00
421.3
L/R
247-16-00
318.2
B
L/R
L/R
L/R
004-44-00
215.4
В
029-21-00
1049.0
177-38-00
D.
L/R
341-56-00
D
E
L/R
L/R
137-07-00
081-27-00
E
A
L/R
143-36-00
Assuming a local origin at A(0,0) and direction A-B as the local North, calculate the
following (in tabular form):
(a) the reduced angles for each traverse station.
(b) the whole circle bearings for the sides of the traverse.
(c) the Northings and Eastings of each station.
(d) report the misclosure in latitude and departure.
EBACBDCED
Transcribed Image Text:ACET208 SURVEYING II - TRAVERSING EXAMPLES QUESTION 1 A traverse survey was performed and the following data was recorded. HORIZ.CIRCLE 106-47-00 I.S. TGT F/S SIDE LENGTH (m) A L/R AB 502.2 A B L/R BC CD DE EA 163-40-00 421.3 L/R 247-16-00 318.2 B L/R L/R L/R 004-44-00 215.4 В 029-21-00 1049.0 177-38-00 D. L/R 341-56-00 D E L/R L/R 137-07-00 081-27-00 E A L/R 143-36-00 Assuming a local origin at A(0,0) and direction A-B as the local North, calculate the following (in tabular form): (a) the reduced angles for each traverse station. (b) the whole circle bearings for the sides of the traverse. (c) the Northings and Eastings of each station. (d) report the misclosure in latitude and departure. EBACBDCED
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Control survey and geodetic reductions
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning