A toy manufacturer is preparing a production schedule for two new toys, trucks and spinning tops. The construction of each toy truck requires 2 hours on Machine A, 3 hours on Machine B, and 5 hours in the Finishing process. The construction of each spinning top requires 1 hour on Machine A, 1 hours on Machine B, and 1 hour in the Finishing process. Machine A has a total of 80 hours available; Machine B has a total of 50 hours available; and the Finishing process has a total of 70 hours available. If the profits on each truck are $7 and for each spinning top are $2, how many of each toy should be made per week to maximize profit? What is the maximum profit? (Be sure to show all constraints, graph with feasible region, and all work needed to support your answer.)
A toy manufacturer is preparing a production schedule for two new toys, trucks and spinning tops. The construction of each toy truck requires 2 hours on Machine A, 3 hours on Machine B, and 5 hours in the Finishing process. The construction of each spinning top requires 1 hour on Machine A, 1 hours on Machine B, and 1 hour in the Finishing process. Machine A has a total of 80 hours available; Machine B has a total of 50 hours available; and the Finishing process has a total of 70 hours available. If the profits on each truck are $7 and for each spinning top are $2, how many of each toy should be made per week to maximize profit? What is the maximum profit? (Be sure to show all constraints, graph with feasible region, and all work needed to support your answer.)
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question

Transcribed Image Text:A toy manufacturer is preparing a production schedule for two new toys, trucks and spinning tops.
The construction of each toy truck requires 2 hours on Machine A, 3 hours on Machine B, and 5 hours
in the Finishing process. The construction of each spinning top requires 1 hour on Machine A, 1
hours on Machine B, and 1 hour in the Finishing process. Machine A has a total of 80 hours available;
Machine B has a total of 50 hours available; and the Finishing process has a total of 70 hours
available. If the profits on each truck are $7 and for each spinning top are $2, how many of each toy
should be made per week to maximize profit? What is the maximum profit? (Be sure to show all
constraints, graph with feasible region, and all work needed to support your answer.)
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images

Recommended textbooks for you

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,