A three phase, four-bus system is shown at figure 1. The transmission line per unit impedances are as follows: LINE Rating (MVA) VOLTAGE (KV) IMPEDANCE (pu) 1-2 100 110 0.08+j0.4 1-3 100 110 0.08+j0.4 2-3 100 110 0.03+j0.3 2-4 100 110 0.01+j0.1 3-4 100 110 0.01+j0.1 The load takes 10MVA at 0.8 power factor lagging at 100kV. If the pre fault voltage at bus 4 is 100kV, determine (a) the fault current supplied by the generator G2 in Amperes; (b) symmetrical fault at bus 4 in Amperes; (c) Short circuit MVA at bus 4. G2 8MVA 110kV 3%R 10%X 5MVA 110kV G1 5%R 15%X BUS1 BUS3 BUS2 G3 10MVA 110kV 3%R 20%X BUS4 LOAD 10MVA @100KV 0.8 power factor lagging

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question

Please answer this diligently. Other answers in the internet seems wrong. Please help me understand and solve this problem. I'll give a like. Thanks!

Ig2sc = __________; Isc = __________; MVAsc = __________

A three phase, four-bus system is shown at figure 1. The transmission line per unit impedances are as
follows:
LINE
Rating (MVA) VOLTAGE (KV) IMPEDANCE (pu)
1-2
100
110
0.08+j0.4
1-3
100
110
0.08+j0.4
2-3
100
110
0.03+j0.3
2-4
100
110
0.01+j0.1
3-4
100
110
0.01+j0.1
The load takes 10MVA at 0.8 power factor lagging at 100kV. If the pre fault voltage at bus 4 is 100kV,
determine (a) the fault current supplied by the generator G2 in Amperes; (b) symmetrical fault at bus 4
in Amperes; (c) Short circuit MVA at bus 4.
Transcribed Image Text:A three phase, four-bus system is shown at figure 1. The transmission line per unit impedances are as follows: LINE Rating (MVA) VOLTAGE (KV) IMPEDANCE (pu) 1-2 100 110 0.08+j0.4 1-3 100 110 0.08+j0.4 2-3 100 110 0.03+j0.3 2-4 100 110 0.01+j0.1 3-4 100 110 0.01+j0.1 The load takes 10MVA at 0.8 power factor lagging at 100kV. If the pre fault voltage at bus 4 is 100kV, determine (a) the fault current supplied by the generator G2 in Amperes; (b) symmetrical fault at bus 4 in Amperes; (c) Short circuit MVA at bus 4.
G2
8MVA
110kV
3%R
10%X
5MVA
110kV
G1
5%R
15%X
BUS1
BUS3
BUS2
G3
10MVA
110kV
3%R
20%X
BUS4
LOAD
10MVA @100KV
0.8 power factor lagging
Transcribed Image Text:G2 8MVA 110kV 3%R 10%X 5MVA 110kV G1 5%R 15%X BUS1 BUS3 BUS2 G3 10MVA 110kV 3%R 20%X BUS4 LOAD 10MVA @100KV 0.8 power factor lagging
Expert Solution
steps

Step by step

Solved in 2 steps with 6 images

Blurred answer
Similar questions
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,