A T-shirt company has three machines, I, II, and III, which can be used to produce two types of T-shirts, standard design and custom design. The following table shows the number of minutes required on each machine to produce the designs. Machine I Machine II Machine III Standard 1 1 1 Custom 1 4 5 For efficient use of equipment, the company uses machine I at least 240 minutes per day, machine II at least 330 minutes per day, and machine III at least 1000 minutes per day. Each standard T-shirt costs $8, and each custom T-shirt costs $9. Find the number of each type of T-shirt that should be produced to minimize costs. (For each answer, enter an exact number.) standard design : custom design : cost (in dollars)
A T-shirt company has three machines, I, II, and III, which can be used to produce two types of T-shirts, standard design and custom design. The following table shows the number of minutes required on each machine to produce the designs.
Machine I Machine II Machine III
Standard 1 1 1
Custom 1 4 5
For efficient use of equipment, the company uses machine I at least 240 minutes per day, machine II at least 330 minutes per day, and machine III at least 1000 minutes per day. Each standard T-shirt costs $8, and each custom T-shirt costs $9.
Find the number of each type of T-shirt that should be produced to minimize costs. (For each answer, enter an exact number.)
standard design :
custom design :
cost (in dollars) :
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images