A supplier for the automobile industry manufactures car and truck frames at two different plants. How many hours should each plant be scheduled to operate to exactly fill each of the orders in the right table? The production rates (in frames per hour) for each plant are given in the left table. Orders Plant Car Frames Truck Frames 2 3 9 Car frames 1170 878 A 1773 1083 1368 B 3 8 Truck frames 1536 Complete the table below. Orders 1 2 3 Number of hours for plant A Number of hours for plant B
Unitary Method
The word “unitary” comes from the word “unit”, which means a single and complete entity. In this method, we find the value of a unit product from the given number of products, and then we solve for the other number of products.
Speed, Time, and Distance
Imagine you and 3 of your friends are planning to go to the playground at 6 in the evening. Your house is one mile away from the playground and one of your friends named Jim must start at 5 pm to reach the playground by walk. The other two friends are 3 miles away.
Profit and Loss
The amount earned or lost on the sale of one or more items is referred to as the profit or loss on that item.
Units and Measurements
Measurements and comparisons are the foundation of science and engineering. We, therefore, need rules that tell us how things are measured and compared. For these measurements and comparisons, we perform certain experiments, and we will need the experiments to set up the devices.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images