A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual O&M costs are $105,000. At the end of the 8-year planning horizon, the mixer will have a salvage value of $5,000. If the mixer is replaced, a new mixer will require an initial investment of $375,000 and at the end of the 8-year planning horizon, the new mixer will have a salvage value of $45,000. Its annual O&M cost will be only $40,000 due to newer technology. Use an EUAC measure and a MARR of 15% to see if the concrete mixer should be replaced if the old mixer is sold for its market value of $65,000. Solve, a. Use the cash flow approach (insider’s viewpoint approach). b. Use the opportunity cost approach (outsider’s view point approach).
A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual O&M costs are $105,000. At the end of the 8-year planning horizon, the mixer will have a salvage value of $5,000. If the mixer is replaced, a new mixer will require an initial investment of $375,000 and at the end of the 8-year planning horizon, the new mixer will have a salvage value of $45,000. Its annual O&M cost will be only $40,000 due to newer technology. Use an EUAC measure and a MARR of 15% to see if the concrete mixer should be replaced if the old mixer is sold for its market value of $65,000. Solve, a. Use the cash flow approach (insider’s viewpoint approach). b. Use the
Trending now
This is a popular solution!
Step by step
Solved in 3 steps