A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual O&M costs are $105,000. At the end of the 8-year planning horizon, the mixer will have a salvage value of $5,000. If the mixer is replaced, a new mixer will require an initial investment of $375,000. At the end of the 8-year planning horizon, it will have a salvage value of $45,000. Its annual O&M cost will be only $40,000 due to newer technology. Analyze this using an EUAC measure and a MARR of 15 percent to see if the concrete mixer should be replaced if the old mixer is sold for its market value of $65,000. a. Use the cash flow approach (insider’s viewpoint approach) b. use the opportunity cost approach (outsiders viewpoint approach) Include formulas in excel screen shots.
A specialty concrete mixer used in construction was purchased for $300,000 7 years ago. Its annual O&M costs are $105,000. At the end of the 8-year planning horizon, the mixer will have a salvage value of $5,000. If the mixer is replaced, a new mixer will require an initial investment of $375,000. At the end of the 8-year planning horizon, it will have a salvage value of $45,000. Its annual O&M cost will be only $40,000 due to newer technology. Analyze this using an EUAC measure and a MARR of 15 percent to see if the concrete mixer should be replaced if the old mixer is sold for its market value of $65,000.
a. Use the cash flow approach (insider’s viewpoint approach)
b. use the
Include formulas in excel screen shots.
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images