A mix design for a major sidewalk construction  project is required. The concrete will not be reinforced, but will be exposed to freezing and thawing with chlorides. The trial mix strength is 32 MPa (including overdesign) with a 75 mm slump. For the sand; FM = 2.60 and its absorption is 1.2%. The coarse aggregate has a nominal maximum size of 19 mm with an absorption of 1.6% and a dry rodded density of 1720 kg/m3. Determine the mix design amounts for the concrete if the coarse aggregate contains 3% water. (keep all calculations and answers to one decimal place except where indicated. That is, round to one decimal place)   Design Water =  kg/m3 Water to Cement (W/CM) ratio =  (two decimal places) Cement Content =  kg/m3 Volume of coarse aggregate per unit volume of concrete =  (two decimal places) Estimated total mass of concrete =  kg/m3 Design mass of coarse aggregate =  kg/m3 Actual mass of coarse aggregate =  kg/m3 Actual mass of fine aggregate =  kg/m3 Actual mass of water added =  kg/m3

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
  1. A mix design for a major sidewalk construction  project is required. The concrete will not be reinforced, but will be exposed to freezing and thawing with chlorides. The trial mix strength is 32 MPa (including overdesign) with a 75 mm slump. For the sand; FM = 2.60 and its absorption is 1.2%. The coarse aggregate has a nominal maximum size of 19 mm with an absorption of 1.6% and a dry rodded density of 1720 kg/m3. Determine the mix design amounts for the concrete if the coarse aggregate contains 3% water. (keep all calculations and answers to one decimal place except where indicated. That is, round to one decimal place)

     

    Design Water =  kg/m3

    Water to Cement (W/CM) ratio =  (two decimal places)

    Cement Content =  kg/m3

    Volume of coarse aggregate per unit volume of concrete =  (two decimal places)

    Estimated total mass of concrete =  kg/m3

    Design mass of coarse aggregate =  kg/m3

    Actual mass of coarse aggregate =  kg/m3

    Actual mass of fine aggregate =  kg/m3

    Actual mass of water added =  kg/m3

     

Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Asphalt binders and mixtures
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning