A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand for the generators is 35 units. The line operates for 7 hours per day, 5 days per week. What is the maximum production time per unit in hours required of the line to meet the demand?
Q: Is the solution field mandatory? Yes O No
A: The term "solution field" refers to a specific space or section of a form, document, or platform…
Q: The Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and…
A: Hence, the required time is 16 minutes.
Q: The wheat harvesting season in the American Midwest is short, and farmers deliver their truckloads…
A: From the given question description, the following information is extracted. Arrival rate λ = 31…
Q: A company that makes a product recently purchased some new equipment that reduces the labor content…
A: Given data is Without new equipment: Workers required = 6 Output = 90 units/hour Workers wage =…
Q: Prince Shop. owns and operates a chain of popular coffee stands that serve over 30 different…
A: The minimum acceptable selling price for the new amaretto cappuccino product:
Q: What is OEE and also calculate the OEE from the given data in below table Items Data Shift Length 8…
A: Given, a table of data.It is required to explain the OEE and then calculate the OEE for the given…
Q: Lead Time Gourmet Helper Appliance Company manufactures home kitchen appliances. The manufacturing…
A: "Value-Added Time": The duration during which a product is being transformed in a way that increases…
Q: The wheat harvesting season in the American Midwest is short, and most farmers deliver their…
A: Note: I have answered for sub-parts (a) to (c) according to the guidelines. Kindly post the…
Q: The wheat harvesting season in the American Midwest is short, and farmers deliver their truckloads…
A: Note- We’ll answer the first three subparts of the question since the exact one wasn’t specified.…
Q: Knott’s Industries manufactures standard and super premium backyard swing sets. Currently it has…
A: Gross machine available time = 4 machines x 8 hours/ day x 250 days/ year Gross machine available…
Q: Motorking Corporation, a market leader in the production of specialized engine additives, is…
A: Marketing is the activity, set of institutions, and processes for creating, communicating,…
Q: The boss at the Precision Machine Shop needs to de-finish the personnel policy,which minimises all…
A: Given that: For junior attendant: λ = 8 μ = 10 For junior attendant: λ = 8 μ = 16
Q: 100 bars per hour
A: given, production = 180000 bars effort = 3 shifts per day 8 hrs. operate = 250days per year
Q: Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company…
A: Note- We’ll answer the first three subparts of the question since the exact one wasn’t specified.…
Q: The Universal Manufacturing Company has a single assem-bly line that feeds two drill presses in…
A: Given data is, Units arrival time(λ)=90 units/hrUnits processing time(μ)=60 units/hr
Q: An output of 720 units per shift (7.40 hours) is desired for a new processing system. The system…
A: Desired output = 720 unitsShift timing = 7.4 hrs.No. of working stations= 4Task time at each station…
Q: Leo manages a receiving station for rice. Farmers deliver their loads of rice from 7 am to 7 pm. Leo…
A: Total load processed from 7AM - 7PM i.e. is On a heavy day, the total load processed can be 96…
Q: A company that makes a product recently purchased some new equipment that reduces the labor content…
A: Answer: Multifactor productivity is derived by dividing the value of output with labor cost.…
Q: B Bunt's fleet repair facility has the capacity to repair 800 trucks per month. However, due to…
A: Formula used- Utilization = Actual Output / Total Capacity
Q: RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods…
A: “Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: A plant runs in two shifts, one shift of 8 hours and during each shift there is 2 hours of planned…
A: efficiency is the ratio of output to the input
Q: A toy firm produces drums sequentially on three machines- A, B, and C- with cycle times of three,…
A: Bottleneck theory is a fundamental concept in production line management. It states that the…
Q: A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand…
A: Given, Weekly demand = 35 units Line operates for 7 hours per day and 5 days per week. Total…
Q: Amy Xia's p lant was designed to produce 7,000 hammers per day but is limited to making 6,000…
A: Production is described as the process through which manufacturing, growing, and creating services,…
Q: Cakes baked by the Freshfood Bakery are transported fromthe ovens to be packaged by one of three…
A: Waiting time is defined as the time interval for which one has to wait after placing the request for…
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: What is the total idle time of the process assuming unlimited demand?
A: Idle time is the time measured minus the total process time by the total cycle time.
A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand for the generators is 35 units. The line operates for 7 hours per day, 5 days per week. What is the maximum production time per unit in hours required of the line to meet the demand?
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
- When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry Panel and CBC run, he spends, on average 2 minutes at patient check-in, 45 minutes in the waiting area, 5 minutes having his medical history updated, and 8 minutes having his blood taken. If the clinical laboratory has 3 full-time Lab Techs, operates 8 hours per day and demand is 75 patients per day, what is the takt time? Assume that the med techs take a 30 minute lunch. Please enter your response using this format: ## minutesA Chocolate manufacturing company produced 180000 bars last year. The company works 3 shifts per day 8 hours shift and operates 250 days per year. The production line is designed to produce 100 bars per hour. The company allocates 0.5 an hour/day for preventive maintenance, 1 hour/ day for employee breaks, and 1.5 hours/day to set up machines for different products. What is the actual outputs? 30 bars per hour 48 bars per hour 60 bars per hour 100 bars per hourSnip
- An output of 720 units per shift (7.40 hours) is desired for a new processing system. The system requires product to pass through four stations where the work content at each station is 26 seconds. What is the required cycle time for such a system? How efficient is your system with the cycle time calculated? Station 3 changes and now requires 50 seconds to complete. What will need to be done to meet demand (assume only 7.40 hours are available)? What is the efficiency of the new system?A company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute the multifactor productivity under each system. Use units per peso cost (labor plus equipment) as the measure.A company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute labor productivity under each system. Use units per worker per hour as the measure of labor productivity.
- The boss at the Precision Machine Shop needs to de-finish the personnel policy,which minimises all running expenses. The overall delivery time at the crib where instruments are available Eight machinists every hour are dispensed to staff. Each one. Each one.Wage of machinist is $20 an hour. The boss should employ the crib with a junior coach who pays $5 per hour.and can handle 10 arrivals an hour or attendant paying $12 an hour was able to handle 16 arrivals every hourHour. Hour. Which individual is selected and what is selected?Be the approximate average hourly cost?The wheat harvesting season in the American Midwest is short, and farmers deliver their truckloads of wheat to a giant central storage bin within a 2-week span. Because of this, wheat-filled trucks waiting to unload and return to the fields have been known to back up for a block at the receiving bin. The central bin is owned cooperatively, and it is to every farmer’s benefit to make the unloading/storage process as efficient as possible. The cost of grain deterioration caused by unloading delays and the cost of truck rental and idle driver time are significant concerns to the cooperative members. Although farmers have difficulty quantifying crop damage, it is easy to assign a waiting and unloading cost for truck and driver of $18 per hour. During the 2-week harvest season, the storage bin is open and operated 16 hours per day, 7 days per week, and can unload 35 trucks per hour according to an exponential distribution. Full trucks arrive all day long (during the hours the bin is open)…The wheat harvesting season in the American Midwest is short, and farmers deliver their truckloads of wheat to a giant central storage bin within a 2-week span. Because of this, wheat-filled trucks waiting to unload and return to the fields have been known to back up for a block at the receiving bin. The central bin is owned cooperatively, and it is to every farmer's benefit to make the unloading/storage process as efficient as possible. The cost of grain deterioration caused by unloading delays and the cost of truck rental and idle driver time are significant concerns to the cooperative members. Although farmers have difficulty quantifying crop damage, it is easy to assign a waiting and unloading cost for truck and driver of $17 per hour. During the 2-week harvest season, the storage bin is open and operated 16 hours per day, 7 days per week, and can unload 34 trucks per hour according to a negative exponential distribution. Full trucks arrive all day long (during the…
- Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units. 4,900 minutes 7,000 minutes 3.8 units per minute 4.0 units per minute 15,827 units 18,620 units Actual run time this week Machine time available per week Actual run rate this week Ideal run rate Defect-free output this week Total output this week (including defects) Required: 1. Compute the utilization rate. (Round your answer to 2 decimal places.) 2. Compute the efficiency rate. (Round your answer to 2 decimal places.) 3. Compute the quality rate. (Round your answer to 2 decimal places.) 4. Compute the overall equipment effectiveness (OEE). (Do not round intermediate calculations. Round your final answer to 3 decimal places.) Utilization rate Efficiency rate Quality rate Overall equipment effectivenessRideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods with plenty of potential customers. With one lot, it has eight cars. Theinterarrival time of potential demand for this lot from its base of customers is 40 minutes.The average rental period is five hours. If a customer checks availability of vehicles in thislot online and finds that they are all rented for the desired time, the customer skips rentingand finds alternative arrangements. However, because customers pay a monthly fee tosubscribe to this service, RideShare does not want customers to be disappointed too often.a. What is the offered load?b. What is the implied utilization?c. What is the capacity of the process (rentals per hour)?d. What is the probability that all eight cars are rented at the same time?e. How many customers are served every hour?f. What is the utilization of the cars?g. How many cars should it have in this lot to ensure that it serves at least 90 percent ofdemand?JB Bunt's fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. What is the utilization of the repair shop?