A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The relevant manufacturing data are given in the table. per Ski Labor-Hours Maximum Labor-Hours Available per Day Slalom Ski 4 1 Trick Ski 6 1 Department Fabricating Finishing Answer parts (A), (B), and (C) below. (A) If the profit on a trick ski is $30 and the profit on a slalom ski is $40, how many of each type of ski should be manufactured each day to realize a maximum profit? What is the maximum profit? The maximum profit is $. The maximum occurs when trick skis and 216 42 slalom skis are produced.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The relevant manufacturing data are given in the table.
Labor-Hours per Ski
Maximum Labor-Hours
Available per Day
Department
Fabricating
Finishing
Answer parts (A), (B), and (C) below.
Trick Ski
6
1
Slalom Ski
4
1
(A) If the profit on a trick ski is $30 and the profit on a slalom ski is $40, how many of each type of ski should be manufactured each day to realize a
maximum profit? What is the maximum profit?
The maximum profit is $ The maximum occurs when
trick skis and
216
42
slalom skis are produced.
Transcribed Image Text:A manufacturing company makes two types of water skis, a trick ski and a slalom ski. The relevant manufacturing data are given in the table. Labor-Hours per Ski Maximum Labor-Hours Available per Day Department Fabricating Finishing Answer parts (A), (B), and (C) below. Trick Ski 6 1 Slalom Ski 4 1 (A) If the profit on a trick ski is $30 and the profit on a slalom ski is $40, how many of each type of ski should be manufactured each day to realize a maximum profit? What is the maximum profit? The maximum profit is $ The maximum occurs when trick skis and 216 42 slalom skis are produced.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,