A manufacturer produces two models of toy airplanes. It takes the manufacturer 25 minutes to assemble model A and 15 minutes to package it. It takes the manufacturer 15 minutes to assemble model B and 5 minutes to package it. In a given week, the total available time for assembling is 2400 minutes, and the total available time for packaging is 1200 minutes. Model A earns a profit of $16 for each unit sold and model B earns a profit of $5 for each unit sold. Assuming the manufacturer is able to sell as many models as it makes, how many units of each model should be produced to maximize the profit for the given week?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Model A: Model B:
A manufacturer produces two models of toy airplanes. It takes the manufacturer 25 minutes to assemble model A and 15
minutes to package it. It takes the manufacturer 15 minutes to assemble model B and 5 minutes to package it. In a given
week, the total available time for assembling is 2400 minutes, and the total available time for packaging is 1200 minutes.
Model A earns a profit of $16 for each unit sold and model B earns a profit of $5 for each unit sold. Assuming the
manufacturer is able to sell as many models as it makes, how many units of each model should be produced to maximize
the profit for the given week?
Transcribed Image Text:A manufacturer produces two models of toy airplanes. It takes the manufacturer 25 minutes to assemble model A and 15 minutes to package it. It takes the manufacturer 15 minutes to assemble model B and 5 minutes to package it. In a given week, the total available time for assembling is 2400 minutes, and the total available time for packaging is 1200 minutes. Model A earns a profit of $16 for each unit sold and model B earns a profit of $5 for each unit sold. Assuming the manufacturer is able to sell as many models as it makes, how many units of each model should be produced to maximize the profit for the given week?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 26 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,