A manufacturer of bicycles builds racing, touring, and mountain models. The bicycles are made of both steel and aluminum. The company has available 98,600 units of steel and 45,000 units of aluminum. The racing, touring, and mountain models need 17, 29, and 34 units of steel, and 9, 24, and 15 units of aluminum, respectively Complete parts (a) through (d) below. C (a) How many of each type of bicycle should be made in order to maximize profit if the company makes $9 per racing bike, $12 per touring bike, and $23 per mountain bike? Let x, be the number of racing bikes, let x, be the number touring bikes, and let x, be the number of mountain bikes. What is the objective function? z-9x, +12x,+23 x, (Do not include the $ symbol in your answers.) To maximize profit, the company should produce racing bike(s). touring bike(s), and mountain bike(s). (Simplity your answers.) (b) What is the maximum possible profit? The maximum profit is S (Simplify your answer) (c) Doos it require all of the available units of steel and aluminum to build the bicycles that produce the maximum profit? If not, how much of each material is left over? Compare any leftover to the value of the relevant slack variable. Select the correct choice below and, if necessary, fill in the answer boxes to complete your choice O A. No. Since s, and s, in the optimal solution, there is/are unit(s) of steel and unit(s) of aluminum, respectively, left over. ARMIMH
A manufacturer of bicycles builds racing, touring, and mountain models. The bicycles are made of both steel and aluminum. The company has available 98,600 units of steel and 45,000 units of aluminum. The racing, touring, and mountain models need 17, 29, and 34 units of steel, and 9, 24, and 15 units of aluminum, respectively Complete parts (a) through (d) below. C (a) How many of each type of bicycle should be made in order to maximize profit if the company makes $9 per racing bike, $12 per touring bike, and $23 per mountain bike? Let x, be the number of racing bikes, let x, be the number touring bikes, and let x, be the number of mountain bikes. What is the objective function? z-9x, +12x,+23 x, (Do not include the $ symbol in your answers.) To maximize profit, the company should produce racing bike(s). touring bike(s), and mountain bike(s). (Simplity your answers.) (b) What is the maximum possible profit? The maximum profit is S (Simplify your answer) (c) Doos it require all of the available units of steel and aluminum to build the bicycles that produce the maximum profit? If not, how much of each material is left over? Compare any leftover to the value of the relevant slack variable. Select the correct choice below and, if necessary, fill in the answer boxes to complete your choice O A. No. Since s, and s, in the optimal solution, there is/are unit(s) of steel and unit(s) of aluminum, respectively, left over. ARMIMH
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
![A manufacturer of bicycles builds racing, touring, and mountain models. The bicycles are made of both steel and aluminum. The company has available 98,600 units
of steel and 45,000 units of aluminum. The racing, touring, and mountain models need 17, 29, and 34 units of steel, and 9, 24, and 15 units of aluminum, respectively
Complete parts (a) through (d) below.
(a) How many of each fype of bicycle should be made in order to maximize profit if the company makes $9 per racing bike, $12 per touring bike, and $23 per
mountain bike?
Let x, be the number of racing bikes, let x, be the number touring bikes, and let x, be the number of mountain bikes. What is the objective function?
z-9x, +12x, 23x
(Do not include the $ symbol in your answers.)
To maximize profit, the company should produce racing bike(s). touring bike(s), and mountain bike(s).
(Simplity your answers.)
(b) What is the maximum possible profit?
The maximum profit is S
(Simplify your answer.)
(c) Doos it require all of the available units of steel and aluminum to buld the bicycles that produce the maximum profit? If not, how much of each material is left
over? Compare any leftover to the value of the rolevant slack variable.
Select the correct choice below and, if necessary, fil in the answer boxes to complete your choice
O A. No. Since s,
and s,
in the optimal solution, there is/are unit(s) of steel and unit(s) of aluminum, respectively, left over.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F84d9888e-0900-465c-b4ba-871b8eb6771e%2F577f086e-e895-4dd0-a853-3dcd0e1f7d90%2F4bmrp_processed.jpeg&w=3840&q=75)
Transcribed Image Text:A manufacturer of bicycles builds racing, touring, and mountain models. The bicycles are made of both steel and aluminum. The company has available 98,600 units
of steel and 45,000 units of aluminum. The racing, touring, and mountain models need 17, 29, and 34 units of steel, and 9, 24, and 15 units of aluminum, respectively
Complete parts (a) through (d) below.
(a) How many of each fype of bicycle should be made in order to maximize profit if the company makes $9 per racing bike, $12 per touring bike, and $23 per
mountain bike?
Let x, be the number of racing bikes, let x, be the number touring bikes, and let x, be the number of mountain bikes. What is the objective function?
z-9x, +12x, 23x
(Do not include the $ symbol in your answers.)
To maximize profit, the company should produce racing bike(s). touring bike(s), and mountain bike(s).
(Simplity your answers.)
(b) What is the maximum possible profit?
The maximum profit is S
(Simplify your answer.)
(c) Doos it require all of the available units of steel and aluminum to buld the bicycles that produce the maximum profit? If not, how much of each material is left
over? Compare any leftover to the value of the rolevant slack variable.
Select the correct choice below and, if necessary, fil in the answer boxes to complete your choice
O A. No. Since s,
and s,
in the optimal solution, there is/are unit(s) of steel and unit(s) of aluminum, respectively, left over.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 6 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.