A manufacturer of 24-hr variable timers, has a monthly fixed cost of $63000 and a production cost of $6 for each timer manufactured. The units sell for $13 each. Find the break-even point algebraically. break-even production 9000 units; break-even revenue $117,000 O nohe of these O break-even production 90000 units; break-even revenue $58,500 O break-even production 9000 units; break-even revenue $58,500 O break-even production 90000 units; break-even revenue $117,000
Unitary Method
The word “unitary” comes from the word “unit”, which means a single and complete entity. In this method, we find the value of a unit product from the given number of products, and then we solve for the other number of products.
Speed, Time, and Distance
Imagine you and 3 of your friends are planning to go to the playground at 6 in the evening. Your house is one mile away from the playground and one of your friends named Jim must start at 5 pm to reach the playground by walk. The other two friends are 3 miles away.
Profit and Loss
The amount earned or lost on the sale of one or more items is referred to as the profit or loss on that item.
Units and Measurements
Measurements and comparisons are the foundation of science and engineering. We, therefore, need rules that tell us how things are measured and compared. For these measurements and comparisons, we perform certain experiments, and we will need the experiments to set up the devices.
![A manufacturer of 24-hr variable timers, has a monthly fixed cost of $63000 and a
production cost of $6 for each timer manufactured. The units sell for $13 each. Find
the break-even point algebraically.
O break-even production 9000 units; break-even revenue $117,000
O none of these
O break-even production 90000 units; break-even revenue $58,500
O break-even production 9000 units; break-even revenue $58,500
O break-even production 90000 units; break-even revenue $117,000
* Previous
Next
1O
do
f1o
144
10
7
8.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F180bd98b-c561-4df3-a2f4-1aa4af5221ff%2F2ff52099-1ea7-436c-a780-d4699ac1482e%2Fvuqbgeb_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
![Advanced Engineering Mathematics](https://www.bartleby.com/isbn_cover_images/9780470458365/9780470458365_smallCoverImage.gif)
![Numerical Methods for Engineers](https://www.bartleby.com/isbn_cover_images/9780073397924/9780073397924_smallCoverImage.gif)
![Introductory Mathematics for Engineering Applicat…](https://www.bartleby.com/isbn_cover_images/9781118141809/9781118141809_smallCoverImage.gif)
![Mathematics For Machine Technology](https://www.bartleby.com/isbn_cover_images/9781337798310/9781337798310_smallCoverImage.jpg)
![Basic Technical Mathematics](https://www.bartleby.com/isbn_cover_images/9780134437705/9780134437705_smallCoverImage.gif)
![Topology](https://www.bartleby.com/isbn_cover_images/9780134689517/9780134689517_smallCoverImage.gif)