A machine shop has five machines, located at (3, 3), (3, 7), (8, 4), (12, 3),and (14, 6), respectively. A new machine is to be located in the shop with thefollowing expected numbers of loads per hour transported to the existingmachines: , 1/8 1/8 1/4 1 1/6, and . Material is transported along parallel aisles, so a rectilinear distance measure is appropriate. Find the coordinates of the optimal locationof the new machine to minimize the weighted sum of the rectilinear distances fromthe new machine to the existing machines

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section12.5: Analytic Steady-state Queueing Models
Problem 18P
icon
Related questions
Question

A machine shop has five machines, located at (3, 3), (3, 7), (8, 4), (12, 3),
and (14, 6), respectively. A new machine is to be located in the shop with the
following expected numbers of loads per hour transported to the existing
machines: , 1/8 1/8 1/4 1 1/6, and . Material is transported along parallel aisles, so a rectilinear distance measure is appropriate. Find the coordinates of the optimal location
of the new machine to minimize the weighted sum of the rectilinear distances from
the new machine to the existing machines

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Optimization models
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,