A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A.1 A.2 C.1 C.2 В.1 В.2 B.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 3 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B. performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; R2 has a nrocece timo of 8 minutoc:

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
A Jack-in-the-box toy includes two components, the jester (part A) and the box
(part B). The following flowchart demonstrates its manufacturing process.
Production of Part A
A.1
A.2
C.1
C.2
B.1
B.2
В.3
Production of Part B
Final assembly
It takes two steps, A.1 and A.2, to make part A, performed by two dedicated
workstations, respectively:
A.1 has a process time of 3 minutes;
A.2 has a process time of 8 minutes.
It takes three steps, B.1, B.2, and B.3, to make part B, performed by three
dedicated operators, respectively:
B.1 has a process time of 5 minutes;
R2 hac a nrocece timo of 8 minutoe
Transcribed Image Text:A Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A.1 A.2 C.1 C.2 B.1 B.2 В.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 3 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; R2 hac a nrocece timo of 8 minutoe
It takes three steps, B.1, B.2, and B.3, to make part B, performed by three
dedicated operators, respectively:
• B.1 has a process time of 5 minutes;
• B.2 has a process time of 8 minutes;
• B.3 has a process time of 2 minutes.
After both parts are produced, they will be combined together to form the final
product through the final assembly operations. This step takes 9 minutes and is
performed by either of the two parallel workstations, C.1 and C.2. Note that C.1
and C.2 perform identical operations and each unit of product requires just one of
them for 9 minutes.
What is the process time of this manufacturing process (in minutes)? Keep 1
decimal place if your answer is not a whole number.
Your Answer:
Answer
Transcribed Image Text:It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: • B.1 has a process time of 5 minutes; • B.2 has a process time of 8 minutes; • B.3 has a process time of 2 minutes. After both parts are produced, they will be combined together to form the final product through the final assembly operations. This step takes 9 minutes and is performed by either of the two parallel workstations, C.1 and C.2. Note that C.1 and C.2 perform identical operations and each unit of product requires just one of them for 9 minutes. What is the process time of this manufacturing process (in minutes)? Keep 1 decimal place if your answer is not a whole number. Your Answer: Answer
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.