a) Identify the appropriate quality control chart(s) for this production. (Hint: First identify the type of measurement for this product, based on which then you can choose the appropriate chart(s).) b) Construct the control chart(s) you have specified in part (a). (As included in the instructions, you only need to identify the three elements of each quality control chart, namely, the CL, UCL, and LCL. No plotting is needed for this question. Same for the later questions.) c) The manager wants to use the control chart(s) you have constructed in part (b) to check a new production line. Table 2 below summaries the inspection results of 3 new samples drawn from the new process. Based on your analysis, do you think the new process is in control overall?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Question 1: Resistors for electronic circuits are manufactured on a high-speed automated machine. To set up the machine
and to create quality control tools to be used throughout the run, 8 samples were taken with 4 resistors in each sample.
The complete list of these samples and their measured values are presented in Table 1 below.
Sample
1
2
3
4
5
67
7
8
Table 1
1010
995
990
1015
1013
994
989
1001
Readings (in OHMS)
985
1009
1015
1009
1005
994
982
996
991
996
1003
1020
1019
1001
992
986
986
994
1008
998
993
1005
1020
996
a) Identify the appropriate quality control chart(s) for this production. (Hint: First identify the type of measurement
for this product, based on which then you can choose the appropriate chart(s).)
b) Construct the control chart(s) you have specified in part (a).
(As included in the instructions, you only need to identify the three elements of each quality control chart,
namely, the CL, UCL, and LCL. No plotting is needed for this question. Same for the later questions.)
c) The manager wants to use the control chart(s) you have constructed in part (b) to check a new production line.
Table 2 below summaries the inspection results of 3 new samples drawn from the new process. Based on your
analysis, do you think the new process is in control overall?
Transcribed Image Text:Question 1: Resistors for electronic circuits are manufactured on a high-speed automated machine. To set up the machine and to create quality control tools to be used throughout the run, 8 samples were taken with 4 resistors in each sample. The complete list of these samples and their measured values are presented in Table 1 below. Sample 1 2 3 4 5 67 7 8 Table 1 1010 995 990 1015 1013 994 989 1001 Readings (in OHMS) 985 1009 1015 1009 1005 994 982 996 991 996 1003 1020 1019 1001 992 986 986 994 1008 998 993 1005 1020 996 a) Identify the appropriate quality control chart(s) for this production. (Hint: First identify the type of measurement for this product, based on which then you can choose the appropriate chart(s).) b) Construct the control chart(s) you have specified in part (a). (As included in the instructions, you only need to identify the three elements of each quality control chart, namely, the CL, UCL, and LCL. No plotting is needed for this question. Same for the later questions.) c) The manager wants to use the control chart(s) you have constructed in part (b) to check a new production line. Table 2 below summaries the inspection results of 3 new samples drawn from the new process. Based on your analysis, do you think the new process is in control overall?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 7 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.