A Company uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor cost. The company based its predetermined overhead rate for the current year on total estimated manufacturing overhead cost of 40\% of direct labor cost. The job cost sheet of Job 2121 shows that the number of units in this job order is 60 units which incurred total of 90 labor-hours. This job consumed $40/unit of direct materials cost and \$90/hour of direct laborWhat would be the total manufacturing cost for Job 2121 approximately ? a \$11,340 b. $5,640 c 13,740 d10,500 e. None of the given answers .
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps