A company produces two products A and B, which have profits of $9 and $7, respectively. Each unit of product must be processed on two assembly lines, where the required production times are as followS Hours/Unit Product Line 1 Line 2 A 12 B Total hours 60 Assignment 1 Con't 77 a) Formulate a linear programming model to determine he optimal product mix that will maximize profit. b) Solve Problem graphically. c) Transform this model into standard form. d) Identify the amount of unused resources (i.e., slack) at ach of the graphical extreme points. e) What would be the effect on the optimal solution if the production time on line 1 was reduced to 40 hours? f) What would be the effect on the optimal solution if the profit for product B was increased from $7 to $15? to $20?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Topic Video
Question
Assignment 1
• A company produces two products A and B, which
have profits of $9 and $7, respectively. Each unit of
product must be processed on two assembly lines,
where the required production times are as follows
Hours/Unit
Product
Line 2
Line 1
A
12
B
4
Total hours
60
40
Assignment 1 Con't
77
(a) Formulate a linear programming model to determine
the optimal product mix that will maximize profit.
(b) Solve Problem graphically.
(c) Transform this model into standard form.
(d) Identify the amount of unused resources (i.e., slack) at
each of the graphical extreme points.
(e) What would be the effect on the optimal solution if the
production time on line 1 was reduced to 4o hours?
(f) What would be the effect on the optimal solution if the
profit for product B was increased from $7 to $15? to $20?
Transcribed Image Text:Assignment 1 • A company produces two products A and B, which have profits of $9 and $7, respectively. Each unit of product must be processed on two assembly lines, where the required production times are as follows Hours/Unit Product Line 2 Line 1 A 12 B 4 Total hours 60 40 Assignment 1 Con't 77 (a) Formulate a linear programming model to determine the optimal product mix that will maximize profit. (b) Solve Problem graphically. (c) Transform this model into standard form. (d) Identify the amount of unused resources (i.e., slack) at each of the graphical extreme points. (e) What would be the effect on the optimal solution if the production time on line 1 was reduced to 4o hours? (f) What would be the effect on the optimal solution if the profit for product B was increased from $7 to $15? to $20?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 7 steps with 1 images

Blurred answer
Knowledge Booster
Optimization
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,