A cobbler family makes mainly two types of shoes for Gents and Ladies. The Gents' shoe takes 1.5 hours of machining time and 3 hours of manual labour. For the Ladies' shoe it takes 3 hours of machining time and 1 hour of manual labour. Maximum machine-time available in a day is 42 hours and man-hours available is 24 hours. The profit on the Gents' shoe and Ladies' shoe are RO 6 and RO 3 respectively. Determine the number of shoes of each type that must be made so as to maximize the profit by optimizing the resources. What is the maximum profit that could be made?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Topic Video
Question
A cobbler family makes mainly two types of shoes
for Gents and Ladies. The Gents' shoe takes 1.5
hours of machining time and 3 hours of manual
labour. For the Ladies' shoe it takes 3 hours of
machining time and 1 hour of manual labour.
Maximum machine-time available in a day is 42
hours and man-hours available is 24 hours. The
profit on the Gents' shoe and Ladies' shoe are RO
6 and RO 3 respectively. Determine the number of
shoes of each type that must be made so as to
maximize the profit by optimizing the resources.
What is the maximum profit that could be made?
Transcribed Image Text:A cobbler family makes mainly two types of shoes for Gents and Ladies. The Gents' shoe takes 1.5 hours of machining time and 3 hours of manual labour. For the Ladies' shoe it takes 3 hours of machining time and 1 hour of manual labour. Maximum machine-time available in a day is 42 hours and man-hours available is 24 hours. The profit on the Gents' shoe and Ladies' shoe are RO 6 and RO 3 respectively. Determine the number of shoes of each type that must be made so as to maximize the profit by optimizing the resources. What is the maximum profit that could be made?
Expert Solution
steps

Step by step

Solved in 5 steps with 1 images

Blurred answer
Knowledge Booster
Optimization
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,