A certain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexity. A typical part is processed sequentially through ten machines in batch sizes of one. The shop contains a total of eight conventional machine tools and operates 40 hours per week of production time. Average time values on each part per machine are: Machining time = 0.5 hour; Work handling time = 0.3 hour; Tool change time = 0.2 hour; Setup time = 3 hours; Nonoperation time = 12 hours. A new programmable machine is being considered that can perform all ten operations in a single setup. The programming of the machine for this part will require 20 hours; however, the programming can be done off-line, without tying up the machine. Setup time will be just 2 hours because simpler fixtures will be used. Total machining time will be reduced to 80% of its previous value due to advanced tool control algorithms; work handling time will be the same as for one machine; and total tool change time will be reduced by 50% because tools will be changed automatically under program control. For the one machine, nonoperation time is expected to be 12 hours, same as for each conventional machine.   (a)Determine the manufacturing lead time for the conventional machines and for the new programmable machine (b)Determine the plant capacity for: (i) a job shop containing the eight traditional machines, and (ii) a job shop containing two of the new programmable machines. Assume both alternatives operate at full capacity. (c)Determine average work-in-process for (i) and (ii) in (b). Use the data given above.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

A certain job shop specializes in one-of-a-kind orders dealing with parts of medium-to-high complexity. A typical part is processed sequentially through ten machines in batch sizes of one. The shop contains a total of eight conventional machine tools and operates 40 hours per week of production time. Average time values on each part per machine are: Machining time = 0.5 hour; Work handling time = 0.3 hour; Tool change time = 0.2 hour; Setup time = 3 hours; Nonoperation time = 12 hours. A new programmable machine is being considered that can perform all ten operations in a single setup. The programming of the machine for this part will require 20 hours; however, the programming can be done off-line, without tying up the machine. Setup time will be just 2 hours because simpler fixtures will be used. Total machining time will be reduced to 80% of its previous value due to advanced tool control algorithms; work handling time will be the same as for one machine; and total tool change time will be reduced by 50% because tools will be changed automatically under program control. For the one machine, nonoperation time is expected to be 12 hours, same as for each conventional machine.

 

(a)Determine the manufacturing lead time for the conventional machines and for the new programmable machine

(b)Determine the plant capacity for: (i) a job shop containing the eight traditional machines, and (ii) a job shop containing two of the new programmable machines. Assume both alternatives operate at full capacity.

(c)Determine average work-in-process for (i) and (ii) in (b). Use the data given above. 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 6 images

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY