A car repair shop has two hoists where cars can be lifted for repair work. Currently customers come in at the rate of 4 per hour and are processed at a similar rate. On average 8 cars are waiting to be processed, 4 needing routine repairs and 4 needing major repairs. People are served on a first come first serve basis. The repair shop owner feels that he is losing many customers needing routine repair because of the long wait. He dedicates one hoist for routine repair and one for major repairs. A study indicates that routine repairs are processed at the rate of 3 per hour and major repairs at the rate of 1 per hour. There are now 5 people waiting on average for routine repairs and 3 waiting on average for major repairs. How long does each type of customer now wait before being served? (i) With the new system, we have Inventory, I = ___________cars. * (ii) With the new system, we have Throughput, R = ___________cars per hour. * (iii) Cars wait an average of ______hours before being served even in the new system. *
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
A car repair shop has two hoists where cars can be lifted for repair work. Currently customers come in at the rate of 4 per hour and are processed at a similar rate. On average 8 cars are waiting to be processed, 4 needing routine repairs and 4 needing major repairs. People are served on a first come first serve basis.
The repair shop owner feels that he is losing many customers needing routine repair because of the long wait. He dedicates one hoist for routine repair and one for major repairs. A study indicates that routine repairs are processed at the rate of 3 per hour and major repairs at the rate of 1 per hour. There are now 5 people waiting on average for routine repairs and 3 waiting on average for major repairs. How long does each type of customer now wait before being served?
(i) With the new system, we have Inventory, I = ___________cars. *
(ii) With the new system, we have Throughput, R = ___________cars per hour. *
(iii) Cars wait an average of ______hours before being served even in the new system. *