A) Assess the effects of project actions on various environmental components using a time- dependent matrix. When evaluating construction impacts, concentrate on the final year (third year) for each utility, as well as for residential and commercial buildings. Subsequently, rank the project actions based on their influence on these components, from the highest impact to the lowest. Provide identical rankings for project actions that have equivalent impacts in the final year. # Environmental component Construction (3 years) Rank UtilitiesRank Residential and commercial buildings 123456700 a Soil and geology 211 321 Flora 221 422 Fauna 221 311 Air quality 000 000 Water quality 010 022 Population density 011 112 Employment 120 342 8 Traffic 220 332 19 Housing 010 121 10 Community structure 010 232 (TOC) for four

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A)
Assess the effects of project actions on various environmental components using a time-
dependent matrix. When evaluating construction impacts, concentrate on the final year (third
year) for each utility, as well as for residential and commercial buildings. Subsequently, rank the
project actions based on their influence on these components, from the highest impact to the
lowest. Provide identical rankings for project actions that have equivalent impacts in the final year.
#
Environmental
component
Construction (3 years)
Rank
UtilitiesRank
Residential and
commercial
buildings
123456700 a
Soil and geology
211
321
Flora
221
422
Fauna
221
311
Air quality
000
000
Water quality
010
022
Population density
011
112
Employment
120
342
8
Traffic
220
332
19
Housing
010
121
10
Community structure
010
232
(TOC) for four
Transcribed Image Text:A) Assess the effects of project actions on various environmental components using a time- dependent matrix. When evaluating construction impacts, concentrate on the final year (third year) for each utility, as well as for residential and commercial buildings. Subsequently, rank the project actions based on their influence on these components, from the highest impact to the lowest. Provide identical rankings for project actions that have equivalent impacts in the final year. # Environmental component Construction (3 years) Rank UtilitiesRank Residential and commercial buildings 123456700 a Soil and geology 211 321 Flora 221 422 Fauna 221 311 Air quality 000 000 Water quality 010 022 Population density 011 112 Employment 120 342 8 Traffic 220 332 19 Housing 010 121 10 Community structure 010 232 (TOC) for four
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning