A 6-yd hydraulic shovel with a bottom-dump bucket is excavating common earth. The swing angle is 75 degree and job efficiency is 40 min/h. The bucket fill factor is 0.9. Estimate the shovel's hourly production in BANK measure. 604.8 BCY/h 263 BCY/h 318.5 BCY/h 483.84 BCY/h Question 2 For the same question: A 6-yd hydraulic shovel with a bottom-dump bucket is excavating common earth. The swing angle is 75 degree and job efficiency is 40 min/h. The bucket fill factor is 0.9, What is the job efficiency required to reduce the current cost per BCY by $5 if the shovel costs $5000 per hour? 1.3 0.666 0.7

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A 6-yd hydraulic shovel with a bottom-dump bucket is excavating common earth. The swing
angle is 75 degree and job efficiency is 40 min/h. The bucket fill factor is 0.9. Estimate the
shovel's hourly production in BANK measure.
604.8 BCY/h
263 BCY/h
318.5 BCY/h
483.84 BCY/h
Question 2
For the same question: A 6-yd hydraulic shovel with a bottom-dump bucket is excavating
common earth. The swing angle is 75 degree and job efficiency is 40 min/h. The bucket fill
factor is 0.9,
What is the job efficiency required to reduce the current cost per BCY by $5 if the shovel costs
$5000 per hour?
1.3
0.666
0.7
1.1
Transcribed Image Text:A 6-yd hydraulic shovel with a bottom-dump bucket is excavating common earth. The swing angle is 75 degree and job efficiency is 40 min/h. The bucket fill factor is 0.9. Estimate the shovel's hourly production in BANK measure. 604.8 BCY/h 263 BCY/h 318.5 BCY/h 483.84 BCY/h Question 2 For the same question: A 6-yd hydraulic shovel with a bottom-dump bucket is excavating common earth. The swing angle is 75 degree and job efficiency is 40 min/h. The bucket fill factor is 0.9, What is the job efficiency required to reduce the current cost per BCY by $5 if the shovel costs $5000 per hour? 1.3 0.666 0.7 1.1
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 8 images

Blurred answer
Knowledge Booster
Dimensional homogeneity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning