A 30-station transfer line has an ideal cycle time of 0.75 min, an average downtime of 6.0 min per line stop occurrence, and a station failure frequency of 0.01 for all stations. A proposal has been submitted to locate a storage buffer between stations 15 and 16 to improve line efficiency. (a) Determine the current line efficiency and production rate (b)Determine the maximum possible line efficiency and production rate that would result from the new proposal. (c)Consider a new proposal to divide the line into three stages: two storage buffers located between stations 10 and 11, and between stations 20 and 21, respectively. Answer Part (b) for this proposal. (d) Now consider the original proposal. Assume that the capacity of the proposed storage buffer is to be 20 parts, and the downtime (Td = 6.0 min) is a constant. Answer Part (b) for this proposal.
A 30-station transfer line has an ideal cycle time of 0.75 min, an average downtime of 6.0 min per line stop occurrence, and a station failure frequency of 0.01 for all stations. A proposal has been submitted to locate a storage buffer between stations 15 and 16 to improve line efficiency.
(a) Determine the current line efficiency and production rate
(b)Determine the maximum possible line efficiency and production rate that would result from the new proposal.
(c)Consider a new proposal to divide the line into three stages: two storage buffers located between stations 10 and 11, and between stations 20 and 21, respectively.
Answer Part (b) for this proposal.
(d) Now consider the original proposal. Assume that the capacity of the proposed storage buffer is to be 20 parts, and the downtime (Td = 6.0 min) is a constant.
Answer Part (b) for this proposal.