A 300 acre watershed just south of Chicago is currently undeveloped (woods). The soils are primarily clay, the hydraulic length of the watershed is 6560 ft, and the average lank slope is 1%. Determine the SCS synthetic UH before development and finish the table below. Solution: 1. For clay sol with woods cover, CN = from Table 11.7; 2. The soil moisture deficit S= in: hr= min 3. For a watershed with hydraulic length, time of concentration T 4. Time to peak T,= hr min 5. Peak discharge Q,= cfs/in 6. Storm duration is AD = hr3 min 7. The -min UH is displayed below using Table 11.11; Time Flow Time Ratios Flow Ratios (min) (cfs) (t/tp) (q/ap)
A 300 acre watershed just south of Chicago is currently undeveloped (woods). The soils are primarily clay, the hydraulic length of the watershed is 6560 ft, and the average lank slope is 1%. Determine the SCS synthetic UH before development and finish the table below. Solution: 1. For clay sol with woods cover, CN = from Table 11.7; 2. The soil moisture deficit S= in: hr= min 3. For a watershed with hydraulic length, time of concentration T 4. Time to peak T,= hr min 5. Peak discharge Q,= cfs/in 6. Storm duration is AD = hr3 min 7. The -min UH is displayed below using Table 11.11; Time Flow Time Ratios Flow Ratios (min) (cfs) (t/tp) (q/ap)
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
![A 300 acre watershed just south of Chicago is currently undeveloped (woods). The soils are primarily clay, the hydraulic length of the watershed is
6560 ft, and the average lank slope is 1%. Determine the SCS synthetic UH before development and finish the table below.
Solution:
from Table 11.7;
1. For clay soil with woods cover, CN=
2. The soil moisture deficit S =
in;
3. For a watershed with hydraulic length, time of concentration Te=
hr
min;
4. Time to peak Tp=
min:
5. Peak discharge Op=
cfsjin;
6. Storm duration is AD=
hr=
min;
7. The
-min UH is displayed below using Table 11.11;
Flow
Time
Time Ratios
Flow Ratios
(min)
(cfs)
(t/tp)
(9/ap)
21
13
0.1
0.2
40
42
0.31
0.4
0.66
0.6
0,93
0.8
125
121
0.93
1.2
102
146
1.4
0.78
167
73
0.56
1.6
51
188
0.39
1.8](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F23f944ba-e4b9-4af5-8b8e-e82a02da697b%2Ff6e181b8-9fa6-4a35-b8ac-582bf8d21033%2F6zrk75o_processed.jpeg&w=3840&q=75)
Transcribed Image Text:A 300 acre watershed just south of Chicago is currently undeveloped (woods). The soils are primarily clay, the hydraulic length of the watershed is
6560 ft, and the average lank slope is 1%. Determine the SCS synthetic UH before development and finish the table below.
Solution:
from Table 11.7;
1. For clay soil with woods cover, CN=
2. The soil moisture deficit S =
in;
3. For a watershed with hydraulic length, time of concentration Te=
hr
min;
4. Time to peak Tp=
min:
5. Peak discharge Op=
cfsjin;
6. Storm duration is AD=
hr=
min;
7. The
-min UH is displayed below using Table 11.11;
Flow
Time
Time Ratios
Flow Ratios
(min)
(cfs)
(t/tp)
(9/ap)
21
13
0.1
0.2
40
42
0.31
0.4
0.66
0.6
0,93
0.8
125
121
0.93
1.2
102
146
1.4
0.78
167
73
0.56
1.6
51
188
0.39
1.8
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning